Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Route Availability
This technical note describes the standards associated with rail vehicle route availability (RA) numbers, and provides guidance on the application of…
Application of the WAG NTSN and NOI NTSN to the Design of Freight Wagons
This document provides guidance on the application of the Rolling Stock - Freight Wagon National Technical Specification Notice (WAG NTSN) and on the…
GMGN2688 Iss 2
June 2024
Withdrawn
- Briefing Notes: 1
- Amendments: 3
- Technical Notes 2
Rail Industry Standard for Driving Cabs
This document sets out supplementary requirements for the design, layout and operational equipment in driving cabs of rail vehicles to the Locomotive…
RIS-2761-RST Iss 1.1
June 2024
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Route Level Assessment of Technical Compatibility between Rail Vehicles and Underline Bridges
This document sets out requirements and guidance for the assessment of compatibility between rail vehicles and underline bridges at route level on the…
RIS-8706-INS Iss 1
June 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Rail Industry Standard for NDT Processes on Rail Vehicles
This document sets out requirements and gives guidance for processes and the certification of operatives, equipment, and facilities used to undertake…
RIS-2701-RST Iss 1
June 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Route Availability Number for Assessment of Compatibility between Rail Vehicles and Underline Bridges
This document sets out requirements for the derivation and use of the Route Availability number for the assessment of compatibility between the static…
GERT8006 Iss 3
March 2021
Live Pending Withdrawal
- Briefing Notes: 1
- Impact Assessments 1
Rail Industry Guidance Note on Vehicle Static Testing
This document gives guidance on meeting the requirements of GMRT2141 'Permissible Track Forces and Resistance to Derailment and Roll-Over of Railway…
GMGN2641 Iss 1
June 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Guidance on evaluating excessive dynamic effects in underline bridges
This document provides guidance on evaluating and managing the risk of excessive dynamic effects in underline bridges resulting from the operating…
Permissible Track Forces and Resistance to Derailment and Roll-Over of Railway Vehicles
This document sets out requirements for railway vehicles regarding permissible track forces, derailment resistance and resistance to roll-over due to…
GMRT2141 Iss 4.1
December 2019
Live Pending Withdrawal
- Briefing Notes: 2
- Impact Assessments 1
- Deviations 2
Changes to National Operations Publications for June 2024
This document is primarily used to publish minor changes to National Operations Publications (NOPs) and has been re-issued, taking into consideration…
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Driver-controlled operation and driver-only operation on-train camera monitoring systems
This technical note will help industry in the design and operation of on-train camera monitoring systems. It provides guidance on the applicable…
Signalling layout and signal aspect sequence requirements
This document sets out requirements for the lineside signalling system to be compatible with train operations and guidance on their application.
RIS-0703-CCS Iss 1.1
September 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 2
- Amendments: 1
- Deviations 1
Management of Control Command and Signalling (CCS) Subsystem Failures, Faults and Defects
This document sets out the management process requirements that apply to safety related failures of control command and signalling (CCS) onboard and…
RIS-0707-CCS Iss 1
September 2023
Withdrawn
- Briefing Notes: 1
- Technical Notes 1
Engineering Requirements for Steam Locomotives and other Heritage Rail Vehicles
This document sets out the engineering requirements for heritage rail vehicles (including steam locomotives) to support use when operating in heritage…
RIS-4472-RST Iss 1
September 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Track to Train RFID Compatibility
This document sets out requirements for RFID compatibility between train and track, including management of application codes.
Operational Requirements for GSM-R Radio
This document contains the necessary requirements and guidance for the development of contingency plans to manage failures of the GSM-R voice system.…
RIS-3780-TOM Iss 1
September 2023
Withdrawn
- Impact Assessments 1
Examination and repair of structural corrosion in Mark 1 type rolling stock
This technical note will help those maintaining or repairing Mark 1 type rolling stock to detect and remedy corrosion on this type of vehicle. This…
ERTMS/ETCS Baseline 3 Onboard Subsystem Requirements
This document sets out the industry agreed requirements and guidance for the Great Britain (GB) application of the ERTMS/ETCS Baseline 3 onboard…
RIS-0797-CCS Iss 1
June 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
RIS-0798-CCS Iss 1
June 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Lineside Operational Signs - Product Requirements
This document sets of the requirements of lineside operational signs that support technical compatibility with rail vehicle exterior lighting and…
GIRT7033 Iss 4
June 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 1
Observing and obeying signalling indications. Train warning systems. Reporting signalling failures and irregularities
You will need this module if you carry out the duties of a driver, person controlling train movements, shunter or signaller.
GERT8000-S7 Iss 5
December 2023
Withdrawn
- Impact Assessments 1
Signal Passed at Danger (SPAD) or Train Trip or Unauthorised Movement
For use by signallers in cases of a SPAD being investigated.
Form NR3189 Iss 1
December 2023
Withdrawn
- Impact Assessments 1
Advice to Train Crews - Conveyance of Radioactive Flask
This form is a Network Rail maintained document and is provided as a stand-alone version of the form originally reproduced as an Appendix to GORT3407…
Form RT3973-NUC Iss 1
December 2023
Withdrawn
Reporting a signal / AWS / TPWS / ATP / TVM failure or irregularity
For use by drivers in all cases of signal, AWS or TPWS irregularities and signallers when the following is reported: A wrong side signalling failure,…
Form RT3185 Iss 12-15
December 2023
Withdrawn
Activation of TPWS or ERTMS tri
This form is used by a signaller to record information obtained from drivers after the activation of TPWS, except when a signal has been passed at…
Form RT3188 02-05
December 2023
Withdrawn
Duties of the person in charge of the siding possession (PICOS)
You will need this handbook if you carry out the duties of a PICOS.
GERT8000-HB13 Iss 3
December 2023
Withdrawn
- Impact Assessments 1
Track circuit block regulations
You will need this module if you carry out the duties of a signaller in a track circuit block area.
Duties of the COSS and person in charge when using a hand trolley
You will need this handbook if you are the COSS or SWL and person in charge when using a hand trolley.
GERT8000-HB10 Iss 4.1
December 2023
Withdrawn
- Impact Assessments 1
Train Operations Staff Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Station duties and train dispatch
You will need this module if you carry out the duties of a driver, a guard, a person in charge (PIC) of dispatch or staff responsible for train…
Gradient sign
This document provides design details for AK202 - Gradient sign
Spring catch board
This document provides design details AK204 sign - Spring catch board.
Train class specific instruction
This document provides design details for AK206 sign - Train class specific instruction.
Coasting board
This document provides design details for AK208 sign - Coasting board.
Warnings for train crew
This document provides design details for AK210 sign - Warnings for train crew.
Infrastructure location names, information and references
This document provides design details for AK212 sign - Infrastructure location names, information and references.
Termination of adhesion condition
This document provides design details for AK214 sign - Termination of adhesion condition
Warnings
This document provides design details for BA02 sign - Warnings.
Mind the gap / step
This document provides design details for CA02 sign - Mind the gap / step.
Supplementary sign for level crossings
This document provides design details for CC02 sign - Supplementary sign for level crossings.
Document Type
Issue Date
From: To:Code of Practice Protection of Non PTS Holders at OTM Stabling Points
This Code of Practice concerns all OTM stabling points and can be used when non PTS holders need to visit site. The document has been written to…
Code of Practice for Use and Loading of MEWPs
This Code of Practice details the use of MEWPs, particularly with processes for loads that should safely be permitted in the work platform of a MEWP.…
Injection Injury
This poster details the actions to be taken following a hydraulic injection injury.
Code of Practice for Action to be Taken in the Event of an Accident or Incident Involving OTP
This Code of Practice details the actions to be taken, and by whom, following an accident or incident involving OTP. It deals with the engineering…
COP0019 Iss 5
June 2022
Withdrawn
Code of Practice for Plant Modules on Rail Wagons and Trailers
This Code of Practice identifies the process to be undertaken when plant modules are attached to rail wagons or trailers. This Code of Practice covers…
Code of Practice for Management of Points within Engineering Work Sites
This Code of Practice is to provide guidance on the arrangements for the Management of Points within Engineering Worksites for all rail borne vehicles…
COP0036 Iss 1
June 2022
Withdrawn
Pulling Rail with Road-Rail Excavator Cranes
This Code of Practice provides good practice in the safe pulling of continuous welded rail (CWR) and to minimise the risk of damage to the CWR or…
Code of Practice for OTP Recovery
This Code of Practice details the processes required for the recovery of failed On Track Plant from the infrastructure.