Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Code of Practice for Plant Any Line Open (ALO) Working
This Code of Practice provides guidance on how to safely manage Plant Any Line Open (ALO) working.
Code of Practice for Hydraulic Hose In-use Repair
This Code of Practice details the action to be taken following the failure of hydraulic hose(s) on an on-track machine (OTM).
Code of Practice for Safe use of Quick Hitches
This Code of Practice identifies the types of quick hitches as categorised by the HSE and details the safety issues and provides safe systems of work…
Code of Practice for OTM Ready to Run Card
This Code of Practice provides guidance on the action to be taken and design of card to show that an applicable on-track machine (OTM) is ready to be…
Code of Practice for Re-railing Kirow Cranes using Outriggers
This Code of Practice provides guidance in the re-railing of Kirow cranes utilising the crane’s outriggers.
Manually propelled equipment in a line blockage
This poster is provided by the M&EE Networking Group to remind industry of the additional measures to take to use manually propelled equipment in a…
Code of Practice for Safe Use of Remote Controls
This Code of Practice identifies the safe use of wired and wireless remote controls for OTP, OTM and other machines in the railway environment. The…
Code of Practice for Haulage Capabilities of On Track Machines
This Code of Practice details the haulage capabilities of on track machines (OTM), it should be followed by any route or operator control when…
Code of Practice for M&EE Documents
This Code of Practice details the process by which the M&EE Networking Group produces documentation and is intended for internal use of the M&EE…
Track System Requirements
This document sets out Great Britain (GB) requirements in scope of the national technical rules for track geometry, track systems and track components…
GCRT5021 Iss 5
March 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 2
- Deviations 8
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Changes to National Operations Publications for March 2024
This document is primarily used to publish minor changes to National Operations Publications (NOPs) and has been re-issued, taking into consideration…
Driver’s Single Line Working Ticket
This form should be used by the driver when single line working applies.
Rule Book Briefing Leaflet
Each issue of the Rule Book Briefing Leaflet contains a summary of the changes being introduced to GERT8000.
Possession of a running line for engineering work
You will need this module if you carry out the duties of a driver or signaller.
GERT8000-T3 Iss 11
December 2023
Withdrawn
- Impact Assessments 1
- Deviations 7
Possession Workers Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
GERM8000-possessionworkers Iss 9
December 2023
Withdrawn
- Impact Assessments 3
Train Driver Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Master manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Signaller and Signalling Technician Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
GERM8000-signallersignallingtechnician Iss 13
December 2023
Withdrawn
- Impact Assessments 3
Rule Book Module Issue History
This document contains updates to align with changes to Rule Book module issues (GERT8000).
Deviation for countdown markers
This document provides design details for DEV-AK102-01 sign - Deviation for station approach countdown markers Applicable to the South West Trains…
Termination of special AWS working
This document provides design details for AA04 sign - Termination of special AWS working.
Permanently installed AWS cancelling indicator
This document provides design details for AA05 sign - Permanently installed AWS cancelling indicator
Warning of the start of cab-signalling
This document provides design details for AB01 sign - Warning of the start of cab-signalling.
Indication of start of cab-signalling
This document provides design details for AB02 sign - Indication of start of cab-signalling.
Indication of end of cab-signalling
This document provides design details for AB03 sign - Indication of end of cab-signalling.
TVM block marker
This document provides design details for AB04 sign - TVM block marker.
Cab signalling shunt entry board
This document provides design details for AB05 sign - Cab signalling shunt entry board.
Emergency telephone
This document provides design details for DB04 sign - Emergency telephone.
Radio electronic token block: loop clear marker
This document provides design details for AB06 sign - Radio electronic token block: loop clear marker.