Menu
Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) In Preparation (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Data, Systems and Telematics Standards Committee -DST (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Technical note (x) Code of Practice (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)

Document Type

Issue Date

From: To:
Sort By:
Results per page:

Live
Issue Date: June 2024

Route Availability Number for Assessment of Compatibility between Rail Vehicles and Underline Bridges

This document sets out requirements for the derivation and use of the Route Availability number for the assessment of compatibility between the static…

Route Availability Number for Assessment of Compatibility between Rail Vehicles and Underline Bridges
GERT8006 Iss 3
March 2021
Live Pending Withdrawal
  • Briefing Notes: 1
  • Impact Assessments 1
Live
Issue Date: May 2024

Public address interface to GSM-R

This technical note will help industry to determine GSM-R cab radio public address announcement priorities when integrated with the onboard public…

Live
Issue Date: May 2024

Fire safety of refurbished passenger seats​

This technical note provides guidance on the application of fire standards to existing vehicles undergoing refurbishment which affects passenger…

Live
Issue Date: March 2024

Code of Practice for OTM Driver Communication Review Group (CRG)

This Code of Practice supports the national strategy for improved Safety Critical Communications.  It provides a collaborative process (M&EE Group OTM…

Live
Issue Date: March 2024

Guidance on the Application of the Control of Electromagnetic Fields at Work Regulations

This document gives guidance on the application of the Control of Electromagnetic Fields at Work Regulations in the railway environment, and…

Live
Issue Date: March 2024

On-Train Camera Monitoring Systems

This document sets out requirements for the installation and use of modern camera systems for the purposes of recording, storing, and accessing video…

On-Train Camera Monitoring Systems
RIS-2712-RST Iss 1.1
March 2024
Withdrawn
  • Briefing Notes: 2
  • Impact Assessments 1
Live
Issue Date: March 2024

Infrastructure Based Train Detection Interface Requirements

This standard specifies the infrastructure based train detection system parameters that are necessary to support technical compatibility with GB…

Infrastructure Based Train Detection Interface Requirements
GKRT0028 Iss 3.1
March 2024
Withdrawn
  • Briefing Notes: 1
Live
Issue Date: March 2024

On-Track Plant, Trolleys and Associated Equipment

This document sets out requirements and guidance for engineering of on-track plant, trolleys and associated equipment.

On-Track Plant, Trolleys and Associated Equipment
RIS-1530-PLT Iss 7
March 2024
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
  • Technical Notes 1
Live
Issue Date: March 2024

Driver’s Single Line Working Ticket

This form should be used by the driver when single line working applies.

Driver’s Single Line Working Ticket
Form RT3193 Iss 12-22
March 2024
Withdrawn
  • Impact Assessments 1
Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) In Preparation (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Data, Systems and Telematics Standards Committee -DST (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Technical note (x) Code of Practice (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)
Sort By:
Results per page:

Live
Issue Date: June 2024

Route Availability

This technical note describes the standards associated with rail vehicle route availability (RA) numbers, and provides guidance on the application of…

Live
Issue Date: June 2024

Application of the WAG NTSN and NOI NTSN to the Design of Freight Wagons

This document provides guidance on the application of the Rolling Stock - Freight Wagon National Technical Specification Notice (WAG NTSN) and on the…

Guidance on Designing Rail Freight Wagons for use on the GB Mainline Railway
GMGN2688 Iss 2
June 2024
Withdrawn
  • Briefing Notes: 1
  • Amendments: 3
  • Technical Notes 2
Live
Issue Date: June 2024

Rail Industry Standard for Driving Cabs

This document sets out supplementary requirements for the design, layout and operational equipment in driving cabs of rail vehicles to the Locomotive…

Rail Industry Standard for Driving Cabs
RIS-2761-RST Iss 1.1
June 2024
Withdrawn
  • Briefing Notes: 2
  • Impact Assessments 1
Live
Issue Date: June 2024

Route Level Assessment of Technical Compatibility between Rail Vehicles and Underline Bridges

This document sets out requirements and guidance for the assessment of compatibility between rail vehicles and underline bridges at route level on the…

Route Level Assessment of Technical Compatibility between Rail Vehicles and Underline Bridges
RIS-8706-INS Iss 1
June 2024
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
Live
Issue Date: June 2024

Lineside Signal and Indicator Product Design and Assessment Requirements

This document sets out requirements and guidance for the management of risk associated with trains exceeding the end of their movement authority.

Lineside Signal and Indicator Product Design and Assessment Requirements
GKRT0057 Iss 1
December 2014
Live Pending Withdrawal
  • Briefing Notes: 1
  • Impact Assessments 1
  • Amendments: 1
Live
Issue Date: June 2024

Rail Industry Guidance Note on Vehicle Static Testing

This document gives guidance on meeting the requirements of GMRT2141 'Permissible Track Forces and Resistance to Derailment and Roll-Over of Railway…

Guidance Note on Vehicle Static Testing
GMGN2641 Iss 1
June 2024
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
Live
Issue Date: June 2024

Guidance on evaluating excessive dynamic effects in underline bridges

This document provides guidance on evaluating and managing the risk of excessive dynamic effects in underline bridges resulting from the operating…

Live
Issue Date: June 2024

Rail Industry Standard for NDT Processes on Rail Vehicles

This document sets out requirements and gives guidance for processes and the certification of operatives, equipment, and facilities used to undertake…

Rail Industry Standard for NDT Processes on Rail Vehicles
RIS-2701-RST Iss 1
June 2024
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
Live
Issue Date: June 2024

Permissible Track Forces and Resistance to Derailment and Roll-Over of Railway Vehicles

This document sets out requirements for railway vehicles regarding permissible track forces, derailment resistance and resistance to roll-over due to…

Permissible Track Forces and Resistance to Derailment and Roll-Over of Railway Vehicles
GMRT2141 Iss 4.1
December 2019
Live Pending Withdrawal
  • Briefing Notes: 2
  • Impact Assessments 1
  • Deviations 2
Live
Issue Date: June 2024

Route Availability Number for Assessment of Compatibility between Rail Vehicles and Underline Bridges

This document sets out requirements for the derivation and use of the Route Availability number for the assessment of compatibility between the static…

Route Availability Number for Assessment of Compatibility between Rail Vehicles and Underline Bridges
GERT8006 Iss 3
March 2021
Live Pending Withdrawal
  • Briefing Notes: 1
  • Impact Assessments 1
Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) In Preparation (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Data, Systems and Telematics Standards Committee -DST (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Technical note (x) Code of Practice (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)
Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) In Preparation (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Data, Systems and Telematics Standards Committee -DST (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Technical note (x) Code of Practice (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)
Sort By:
Results per page:

Live
Issue Date: June 2015

Lower pantograph

This document provides design details for AJ03 sign - Lower pantograph.

Live
Issue Date: June 2015

Temporary speed restriction warning boards (km/h)

This document provides design details for AF02k sign - Temporary speed restriction warning boards (km/h).

Live
Issue Date: June 2015

Horse riders to dismount at crossings where there are overhead electric lines

This document provides design details for CC17 sign - Horse riders to dismount at crossings where there are overhead electric lines.

Live
Issue Date: June 2015

Lineside telephone

This document provides design details for DB03 sign - Lineside telephone.

Live
Issue Date: June 2015

Telephone number

This document provides design details for DA01 sign - Telephone number

Live
Issue Date: June 2015

White diamond with 'X'

This document provides design details for DA03 sign - White diamond with 'X'.

Live
Issue Date: June 2015

Signal post telephone - limited clearance label

This document provides design details for DB02 sign - Signal post telephone - limited clearance label.

Live
Issue Date: June 2015

Mid-platform train berth markers

This document provides design details for AK105 sign - Mid-platform train berth markers.

Live
Issue Date: June 2015

Countdown markers

This document provides design details for AK102 sign - Countdown markers.

Live
Issue Date: June 2015

Commencement of AWS gap

This document provides design details for AA01 sign - Commencement of AWS gap.

Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) In Preparation (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Data, Systems and Telematics Standards Committee -DST (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Technical note (x) Code of Practice (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)