Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Code of Practice for Route Knowledge within Possessions
This Code of Practice contains guidance and generic good practice for the management of route knowledge for train drivers within a possession. It sets…
Seasonal Operating of OTP
This poster is provided by the M&EE Networking Group to remind operators when adhesion is low, keep it slow.
Rail Handling – Rail Turner Awareness
This poster is provided by the M&EE Networking Group to remind industry about the competence requirements necessary for the Crane Controller and…
OTP Mechanical Movement Limiting Device
This poster is provided by the M&EE Networking Group to remind the industry about the use of mechanical movement limiting device and the restrictions…
Code of Practice for Brake Testing of OTP
This Code of Practice details the testing of the braking system of OTP excluding Trolleys during operations and routine maintenance examination…
Driver-controlled operation and driver-only operation on-train camera monitoring systems
This technical note will help industry in the design and operation of on-train camera monitoring systems. It provides guidance on the applicable…
Rule Book Module Issue History
This document contains updates to align with changes to Rule Book module issues (GERT8000).
Preparation and working of freight trains
You will need this module if you carry out the duties of the following in relation to freight trains: train driver, guard, shunter, train preparer.
Rule Book Handbook Issue History
This document contains updates to align with changes to Rule Book Handbook issues (GERT8000).
GERT8000 Issue HB Iss 16
December 2023
Withdrawn
- Impact Assessments 1
Activation of TPWS or ERTMS tri
This form is used by a signaller to record information obtained from drivers after the activation of TPWS, except when a signal has been passed at…
Form RT3188 02-05
December 2023
Withdrawn
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Axle Bearing Condition Monitoring
This document sets out requirements and guidance for condition monitoring of axle bearings, whether by trackside or onboard detection systems.
GEGN8614 Iss 1
June 2023
Withdrawn
- Briefing Notes: 1
GERT8014 Iss 2
June 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 1
- Deviations 1
Urgent High-Risk Defect Report Form
In the event that the NIR-Online system is unavailable, details of urgent high-risk defects, faults and failures shall be shared by completing and…
Assessment of Passenger Seat Comfort
This document gives guidance on the assessment of static comfort for passenger seats on rolling stock. It includes criteria to measure aspects of a…
Movement of Continental Wagons on the GB Network
RIS-2770-RST Iss 1 sets out requirements and guidance around the process of registering and assessing compatibility of wagons not registered in GB for…
RIS-2770-RST Iss 1
June 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Guidance on Operational Railway Safety Awareness
This document is aimed at Railway Undertakings and any other railway actors operating in or around the railway environment. It gives guidance on…
ERTMS/ETCS Baseline 3 Onboard Subsystem Requirements
This document sets out the industry agreed requirements and guidance for the Great Britain (GB) application of the ERTMS/ETCS Baseline 3 onboard…
RIS-0797-CCS Iss 1
June 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
RIS-0798-CCS Iss 1
June 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Management of Safety-Related Rail Vehicle Defects
This document defines requirements for recording, analysing and reporting safety-related defects, faults and failures on rail vehicles, plant and…
RIS-8250-RST Iss 1
June 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 2
Communication of urgent operating advice
This standard sets out requirements, rationale and guidance for reporting and communicating urgent operating safety information.
RIS-3350-TOM Iss 1
June 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Reporting of adverse events
This technical note will help industry to understand the reporting systems for safety related issues provided by the Rail Safety and Standards Board…
Engineering change (software and firmware)
This technical note provides signposts to existing standards and good practice in engineering change management relating to software and firmware.
ETCS identification plate
This document provides design details for AC11 sign - ETCS identification plate.
Train class specific no entry
This document provides design details for AK207 sign - Train class specific no entry.
Temporary speed restriction spate indicator
This document provides design details for AF07 sign - Temporary speed restriction spate indicator.
Miscellaneous instructions to train crew
This document provides design details for AK209 sign - Miscellaneous instructions to train crew.
Emergency indicator
This document provides design details for AF01 sign - Emergency indicator.
Possession limit board
This document provides design details for AG01 sign - Possession limit board.
Sandite markers
This document provides design details for AK211 sign - Sandite markers.
Bridge identity plates
This document provides design details for AK213 sign - Bridge identity plates.
Worksite exit marker
This document provides design details for AG03 sign - Worksite exit marker.
Temporary speed restriction warning boards (mph)
This document provides design details for AF02m sign - Temporary speed restriction warning boards (mph).
Document Type
Issue Date
From: To:Code of Practice for Safety Critical Maintenance Elements of Small Plant and Equipment
This Code of Practice details the arrangement for, and safety critical work implications of, the maintenance of small plant and equipment. This has…
COP0010 Iss 2
December 2012
Withdrawn
Code of Practice for Audit Protocol for Supply of Machine / Crane Controllers
This Audit Protocol provides a comprehensive list of questions for an auditor to ask and detailed guidance of what is expected of an auditor whilst…