Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Pulling Rail with Road-Rail Excavator Cranes
This Code of Practice provides good practice in the safe pulling of continuous welded rail (CWR) and to minimise the risk of damage to the CWR or…
Code of Practice for OTP Recovery
This Code of Practice details the processes required for the recovery of failed On Track Plant from the infrastructure.
Code of Practice for Working Safety Practices for Maintenance and Repair of OTMs
This Code of Practice contains guidance on the safety conditions and behaviours to enable safe maintenance of on-track machines (OTMs).
Code of Practice for the Storage and Recommissioning of OTP
This Code of Practice defines the actions to be taken for any OTP designated as Out of Service recommending a minimum level of maintenance is…
Code of Practice for Management of OTM Speeds within T3 Engineering Possessions
This Code of Practice contains guidance and generic good practice for the management of OTM speeds within T3 engineering possessions. It sets out the…
COP0126 Iss 2
March 2022
Withdrawn
Code of Practice for Loose Materials on OTMs
This Code of Practice details the action to be taken to safely store loose material on an on-track machine.
Code of Practice for Planning for the Use of Non-rail Mounted Plant
This Code of Practice details minimum requirements for planning and mitigating the risks when delivering work using non rail mounted plant that could…
Code of Practice for Defect Reporting for OTP, Plant and Equipment
This Code of Practice details the systems to have in place so that all safety related defects are reported and that other reported defects are checked…
COP0012 Iss 6
March 2021
Withdrawn
Code of Practice for Flailing Operations using OTP
This Code of Practice details the actions to be taken, when planning for, and undertaking flailing operations using OTP..
Code of Practice for Handling Servicable Rail with RRV Excavator Cranes Including Thimbling
This Code of Practice details the equipment and working practices for handling and thimbling of serviceable rail, using RRV excavator cranes, to…
COP0005 Iss 5
December 2019
Withdrawn
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Track System Requirements
This document sets out Great Britain (GB) requirements in scope of the national technical rules for track geometry, track systems and track components…
GCRT5021 Iss 5
March 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 2
- Deviations 8
GB Requirements for Platform Height, Platform Offset and Platform Width
GIRT7020 Issue 2 sets out GB requirements in scope of National Technical Rules for platform height, platform offset and platform width.
GIRT7020 Iss 1.1
September 2022
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 52
Size of Vehicles and Position of Equipment
This document sets out Great Britain (GB) requirements in scope of National Technical Rules for the methods of determining the swept envelope of rail…
GMRT2173 Iss 3
September 2022
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 4
Rail Industry Standard on Signal Overrun Risk Evaluation and Assessment
This document sets out the approach for the management of signal overrun risk consistent with the application of the Common Safety Method on Risk…
GIRT7006 Iss 1
December 2014
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
- Deviations 2
GIGN7606 Iss 1
December 2014
Withdrawn
- Briefing Notes: 2
Mechanical Trainstop System Interface
This document details the track / train interface requirements for mechanical trainstop systems. GERT8018 issue two which has been up-issued following…
GERT8018 Iss 1
December 2012
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
- Deviations 5
Guidance on Mechanical Trainstop System
This document gives guidance on GERT8018 issue two which has been up-issued following completion of the filtering process that identifies that a…
Lineside Signal and Indicator Product Design and Assessment Requirements
This document mandates the technical parameters for lineside signalling hardware and displays, and the scope of readability assessment applicable to…
GKRT0045 Iss 3
March 2015
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
- Amendments: 2
- Deviations 20
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Duties of the person in charge of the possession (PICOP)
You will need this handbook if you carry out the duties of the PICOP.
GERT8000-HB11 Iss 9
December 2022
Withdrawn
- Impact Assessments 1
Duties of the person in charge of the possession (PICOP) on ERTMS lines where lineside signals are not provided
You will need this handbook if you carry out the duties of the person in charge of the possession (PICOP) on ERTMS lines. This document has been…
GERT8000-HB11 ERTMS Iss 1
December 2015
Withdrawn
- Impact Assessments 2
Possession Arrangements Form
This form is used by the PICOP to record the arrangements for a possession of a running line.