From: To:Pulling Rail with Road-Rail Excavator Cranes
This Code of Practice provides good practice in the safe pulling of continuous welded rail (CWR) and to minimise the risk of damage to the CWR or…
Code of Practice for Action to be Taken in the Event of an Accident or Incident Involving OTP
This Code of Practice details the actions to be taken, and by whom, following an accident or incident involving OTP. It deals with the engineering…
COP0019 Iss 5
June 2022
Withdrawn
Code of Practice for the Storage and Recommissioning of OTP
This Code of Practice defines the actions to be taken for any OTP designated as Out of Service recommending a minimum level of maintenance is…
Code of Practice for Working Safety Practices for Maintenance and Repair of OTMs
This Code of Practice contains guidance on the safety conditions and behaviours to enable safe maintenance of on-track machines (OTMs).
Code of Practice for Management of OTM Speeds within T3 Engineering Possessions
This Code of Practice contains guidance and generic good practice for the management of OTM speeds within T3 engineering possessions. It sets out the…
COP0126 Iss 2
March 2022
Withdrawn
Code of Practice for Loose Materials on OTMs
This Code of Practice details the action to be taken to safely store loose material on an on-track machine.
Code of Practice for Planning for the Use of Non-rail Mounted Plant
This Code of Practice details minimum requirements for planning and mitigating the risks when delivering work using non rail mounted plant that could…
Code of Practice for Defect Reporting for OTP, Plant and Equipment
This Code of Practice details the systems to have in place so that all safety related defects are reported and that other reported defects are checked…
COP0012 Iss 6
March 2021
Withdrawn
Code of Practice for Flailing Operations using OTP
This Code of Practice details the actions to be taken, when planning for, and undertaking flailing operations using OTP..
Code of Practice for On, Off and Cross Tracking of On Track Plant (OTP)
This code of practice gives guidance for the safe on and off tracking of road-rail vehicles to mitigate the possibility of derailing or overturning…
COP0007 Iss 6
December 2019
Withdrawn
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Duties of the person in charge of the possession (PICOP)
You will need this handbook if you carry out the duties of the PICOP.
GERT8000-HB11 Iss 9
December 2022
Withdrawn
- Impact Assessments 1
Duties of the person in charge of the possession (PICOP) on ERTMS lines where lineside signals are not provided
You will need this handbook if you carry out the duties of the person in charge of the possession (PICOP) on ERTMS lines. This document has been…
GERT8000-HB11 ERTMS Iss 1
December 2015
Withdrawn
- Impact Assessments 2
Possession Arrangements Form
This form is used by the PICOP to record the arrangements for a possession of a running line.
Issue Date
From: To:No results found
Issue Date
From: To:Code of Practice for Safe Use of Remote Controls
This Code of Practice identifies the safe use of wired and wireless remote controls for OTP, OTM and other machines in the railway environment. The…
Code of Practice for Planning and Executing Lifting Operations
This Code of Practice concerns all lifting operations involving rail cranes, twin jib cranes, road-rail excavator cranes, and vehicle mounted knuckle…
COP0011 Iss 5
December 2020
Withdrawn
Code of Practice for OTP Machine ~ Crane Controller Checklists
This Code of Practice details a recommended standard industry checklist for Machine and Crane Controllers when using On-Track Plant. This checklist…
COP0016 Iss 4
December 2019
Withdrawn
Code of Practice for OTM Driver Communication Review Group (CRG)
This Code of Practice supports the national strategy for improved Safety Critical Communications. It provides a collaborative process (M&EE Group OTM…
Code of Practice for Action following Hydraulic Pump and/or Motor Failure
This Code of Practice details the details the action to be taken following the failure of an hydraulic pump and/or motor on an on-track machine (OTM).
COP0039 Iss 1
March 2024
Withdrawn
Code of Practice for Plant Any Line Open (ALO) Working
This Code of Practice provides guidance on how to safely manage Plant Any Line Open (ALO) working.
Code of Practice for Hydraulic Hose In-use Repair
This Code of Practice details the action to be taken following the failure of hydraulic hose(s) on an on-track machine (OTM).
Code of Practice for Safe use of Quick Hitches
This Code of Practice identifies the types of quick hitches as categorised by the HSE and details the safety issues and provides safe systems of work…
Code of Practice for OTM Ready to Run Card
This Code of Practice provides guidance on the action to be taken and design of card to show that an applicable on-track machine (OTM) is ready to be…
Code of Practice for Re-railing Kirow Cranes using Outriggers
This Code of Practice provides guidance in the re-railing of Kirow cranes utilising the crane’s outriggers.