Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Changes to National Operations Publications for June 2024
This document is primarily used to publish minor changes to National Operations Publications (NOPs) and has been re-issued, taking into consideration…
Driver’s Single Line Working Ticket
This form should be used by the driver when single line working applies.
Master manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Rule Book Briefing Leaflet
Each issue of the Rule Book Briefing Leaflet contains a summary of the changes being introduced to GERT8000.
Signaller and Signalling Technician Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
GERM8000-signallersignallingtechnician Iss 13
December 2023
Withdrawn
- Impact Assessments 3
Possession of a running line for engineering work
You will need this module if you carry out the duties of a driver or signaller.
GERT8000-T3 Iss 11
December 2023
Withdrawn
- Impact Assessments 1
- Deviations 7
Possession Workers Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
GERM8000-possessionworkers Iss 9
December 2023
Withdrawn
- Impact Assessments 3
Train Driver Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Supplementary sign where crossing is used for animal traffic (PCR diagram 118)
This document provides design details for CC16 sign - Supplementary sign where crossing is used for animal traffic (PCR diagram 118).
Sign CC16 Iss 1
June 2023
Withdrawn
FTAP Flexible Train Arrival Point
A set of four signs to direct engineering trains or on-track machine to locate the required stopping point within a possession or protection zone when…
End of Emergency special Working
This document provides design details for sign AK215 - End of Emergency Special Working
Temporary Speed Restriction Repeater Warning Board
This document provides design details for AF03 sign - Temporary speed restriction repeater warning board.
Signs at access points - information
This document provides design details for BC01 sign - Signs at access points - information.
Danger from passing trains
This document provides design details for CA01 sign - Danger from passing trains.
Danger - No unauthorised access
This document provides design details for CA03 sign - Danger - no authorised access.
Document Type
Issue Date
From: To:Code of Practice for Working Safety Practices for Maintenance and Repair of OTMs
This Code of Practice contains guidance on the safety conditions and behaviours to enable safe maintenance of on-track machines (OTMs).
Code of Practice for the Storage and Recommissioning of OTP
This Code of Practice defines the actions to be taken for any OTP designated as Out of Service recommending a minimum level of maintenance is…
Code of Practice for Management of OTM Speeds within T3 Engineering Possessions
This Code of Practice contains guidance and generic good practice for the management of OTM speeds within T3 engineering possessions. It sets out the…
COP0126 Iss 2
March 2022
Withdrawn
Autumn Poster 2021
This poster details the actions to be taken when rail adhesion is worse than would be expected. Also what to do when asked to make a controlled test…
Code of Practice for Loose Materials on OTMs
This Code of Practice details the action to be taken to safely store loose material on an on-track machine.
Code of Practice for Planning for the Use of Non-rail Mounted Plant
This Code of Practice details minimum requirements for planning and mitigating the risks when delivering work using non rail mounted plant that could…