Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Advice to Train Crews - Conveyance of Radioactive Flask
This form is a Network Rail maintained document and is provided as a stand-alone version of the form originally reproduced as an Appendix to GORT3407…
Form RT3973-NUC Iss 1
December 2023
Withdrawn
Duties of the person in charge of the siding possession (PICOS)
You will need this handbook if you carry out the duties of a PICOS.
GERT8000-HB13 Iss 3
December 2023
Withdrawn
- Impact Assessments 1
Track circuit block regulations
You will need this module if you carry out the duties of a signaller in a track circuit block area.
Passing a signal at danger or an end of authority (EoA) without a movement authority (MA)
You will need this module if you carry out the duties of a: driver, guard, shunter or signaller. You will also need this module if you carry out the…
GERT8000-S5 Iss 10
December 2023
Withdrawn
- Impact Assessments 1
Signal Passed at Danger (SPAD) or Train Trip or Unauthorised Movement
For use by signallers in cases of a SPAD being investigated.
Form NR3189 Iss 1
December 2023
Withdrawn
- Impact Assessments 1
Dealing with a train accident or train evacuation
You will need this module if you carry out the duties of a driver, guard or signaller.
GERT8000-M1 Iss 6
December 2023
Withdrawn
- Impact Assessments 1
Train stopped by train failure
You will need this module if you carry out the duties of a driver or signaller.
General signalling regulations
You will need this module if you carry out the duties of a signaller.
Failure of, or work on, signalling equipment - signallers' regulations
You will need this module if you carry out the duties of a signaller.
GERT8000-TS11 Iss 5.1
December 2023
Withdrawn
- Impact Assessments 1
Working of on-track machines (OTM)
You will need this module if you carry out the duties of a driver of an on-track machine, an operator of an on-track machine or a signaller.
GERT8000-OTM Iss 10
December 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Supplementary sign where crossing is used for animal traffic (PCR diagram 118)
This document provides design details for CC16 sign - Supplementary sign where crossing is used for animal traffic (PCR diagram 118).
Sign CC16 Iss 1
June 2023
Withdrawn
FTAP Flexible Train Arrival Point
A set of four signs to direct engineering trains or on-track machine to locate the required stopping point within a possession or protection zone when…
End of Emergency special Working
This document provides design details for sign AK215 - End of Emergency Special Working
Temporary Speed Restriction Repeater Warning Board
This document provides design details for AF03 sign - Temporary speed restriction repeater warning board.
Horse riders to dismount at crossings where there are overhead electric lines
This document provides design details for CC17 sign - Horse riders to dismount at crossings where there are overhead electric lines.
Lineside telephone
This document provides design details for DB03 sign - Lineside telephone.
Telephone number
This document provides design details for DA01 sign - Telephone number
Document Type
Issue Date
From: To:Code of Practice for Use and Loading of MEWPs
This Code of Practice details the use of MEWPs, particularly with processes for loads that should safely be permitted in the work platform of a MEWP.…
Code of Practice Protection of Non PTS Holders at OTM Stabling Points
This Code of Practice concerns all OTM stabling points and can be used when non PTS holders need to visit site. The document has been written to…
Pulling Rail with Road-Rail Excavator Cranes
This Code of Practice provides good practice in the safe pulling of continuous welded rail (CWR) and to minimise the risk of damage to the CWR or…
Code of Practice for Action to be Taken in the Event of an Accident or Incident Involving OTP
This Code of Practice details the actions to be taken, and by whom, following an accident or incident involving OTP. It deals with the engineering…
COP0019 Iss 5
June 2022
Withdrawn
Code of Practice for OTP Recovery
This Code of Practice details the processes required for the recovery of failed On Track Plant from the infrastructure.
Code of Practice for Plant Modules on Rail Wagons and Trailers
This Code of Practice identifies the process to be undertaken when plant modules are attached to rail wagons or trailers. This Code of Practice covers…
Code of Practice for Management of Points within Engineering Work Sites
This Code of Practice is to provide guidance on the arrangements for the Management of Points within Engineering Worksites for all rail borne vehicles…
COP0036 Iss 1
June 2022
Withdrawn