Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Rule Book Module Issue History
This document contains updates to align with changes to Rule Book module issues (GERT8000).
Preparation and working of freight trains
You will need this module if you carry out the duties of the following in relation to freight trains: train driver, guard, shunter, train preparer.
Rule Book Handbook Issue History
This document contains updates to align with changes to Rule Book Handbook issues (GERT8000).
GERT8000 Issue HB Iss 16
December 2023
Withdrawn
- Impact Assessments 1
Activation of TPWS or ERTMS tri
This form is used by a signaller to record information obtained from drivers after the activation of TPWS, except when a signal has been passed at…
Form RT3188 02-05
December 2023
Withdrawn
Observing and obeying signalling indications. Train warning systems. Reporting signalling failures and irregularities
You will need this module if you carry out the duties of a driver, person controlling train movements, shunter or signaller.
GERT8000-S7 Iss 5
December 2023
Withdrawn
- Impact Assessments 1
Track Workers Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Duties of the COSS and person in charge when using a hand trolley
You will need this handbook if you are the COSS or SWL and person in charge when using a hand trolley.
GERT8000-HB10 Iss 4.1
December 2023
Withdrawn
- Impact Assessments 1
Work on signalling equipment – duties of the signalling technician
You will need this handbook if you carry out the duties of a signalling technician.
GERT8000-HB19 Iss 4.1
December 2023
Withdrawn
- Impact Assessments 1
Train Operations Staff Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
25 kV AC electrification boundary - entering
This document provides design details for AJ05 sign - 25 kV AC electrification boundary - entering.
Permissible speed indicators (km/h)
This document provides design details for AD01k sign - Permissible speed indicators (km/h).
Permissible speed indicators (mph)
This document provides design details for AD01m sign - Permissible speed indicators (mph).
Permissible speed indicators (km/h) for limited clearance
This document provides design details for AD02k sign - Permissible speed indicators (km/h) for limited clearance.
Permissible speed indicators (mph) for limited clearance
this document provides design details for AD02m sign - Permissible speed indicators (mph) for limited clearance.
Permissible speed warning indicators (km/h)
This document provides design details for AD03k sign - Permissible speed warning indicators (km/h).
Permissible speed warning indicators (mph)
This document provides design details for AD03m sign - Permissible speed warning indicators (mph).
Permissible speed warning indicators (km/h) for limited clearance
This document provides design details for AD04k sign - Permissible speed warning indicators (km/h) for limited clearance.
Permissible speed warning indicators (mph) for limited clearance
This document provides design details for AD04m sign - Permissible speed warning indicators (mph) for limited clearance.
Permissible speed directional arrows
This document provides design details for AD05 sign - Permissible speed directional arrows.