Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Rule Book Handbook Issue History
This document contains updates to align with changes to Rule Book Handbook issues (GERT8000).
GERT8000 Issue HB Iss 16
December 2023
Withdrawn
- Impact Assessments 1
Duties of the COSS and person in charge when using a hand trolley
You will need this handbook if you are the COSS or SWL and person in charge when using a hand trolley.
GERT8000-HB10 Iss 4.1
December 2023
Withdrawn
- Impact Assessments 1
Work on signalling equipment – duties of the signalling technician
You will need this handbook if you carry out the duties of a signalling technician.
GERT8000-HB19 Iss 4.1
December 2023
Withdrawn
- Impact Assessments 1
Train Operations Staff Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Track Workers Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Operational Requirements for GSM-R Radio
This document contains the necessary requirements and guidance for the development of contingency plans to manage failures of the GSM-R voice system.…
RIS-3780-TOM Iss 1
September 2023
Withdrawn
- Impact Assessments 1
Reporting a signal / AWS / TPWS / ATP / TVM failure or irregularity
For use by drivers in all cases of signal, AWS or TPWS irregularities and signallers when the following is reported: A wrong side signalling failure,…
Form RT3185 Iss 12-15
December 2023
Withdrawn
Advice to Train Crews - Conveyance of Radioactive Flask
This form is a Network Rail maintained document and is provided as a stand-alone version of the form originally reproduced as an Appendix to GORT3407…
Form RT3973-NUC Iss 1
December 2023
Withdrawn
Duties of the person in charge of the siding possession (PICOS)
You will need this handbook if you carry out the duties of a PICOS.
GERT8000-HB13 Iss 3
December 2023
Withdrawn
- Impact Assessments 1
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Sign indicating the penalty for failure to shut a gate at a vehicular crossing (PCR diagram 105)
This document provides design details for CC07 sign - Sign indicating the penalty for failure to shut a gate at a vehicular crossing (PCR diagram…
Instructions for use at a crossing with miniature red / green lights and user-operated gates (PCR diagram 109)
This document provides design details for CC09 sign - Instructions for use at a crossing with miniature red / green lights and user-operated gates…
Reminder at a crossing with user-operated gates (PCR diagram 111)
This document provides design details for CC11 sign - Reminder at a crossing with user-operated gates (PCR diagram 111)
Temporary speed restriction speed indicators (km/h)
This document provides design details for AF04k sign - Temporary speed restriction speed indicators (km/h).
Sign at a vehicular crossing where there are overhead electric wires and the road approaches are on a gradient (PCR diagram 113)
This document provides design details for CC13 sign - Sign at a vehicular crossing where there are overhead electric wires and the road approaches are…
High visibility clothing obligatory
This document provides design details for BA01 sign - High visibility clothing obligatory.
Access prohibited sign
This document provides design details for BA03 sign - Access prohibited sign.
Instructions at a crossing with gates (PCR diagram 115)
This document provides design details for CC15 sign instructions at a crossing with gates (PCR diagram 115).
Text signs
This document provides design details for BB01 sign - Text signs.
Electrical hazard
This document provides design details for BD01 sign - Electrical hazard.