Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Changes to National Operations Publications for June 2024
This document is primarily used to publish minor changes to National Operations Publications (NOPs) and has been re-issued, taking into consideration…
Driver’s Single Line Working Ticket
This form should be used by the driver when single line working applies.
Master manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Rule Book Briefing Leaflet
Each issue of the Rule Book Briefing Leaflet contains a summary of the changes being introduced to GERT8000.
Signaller and Signalling Technician Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
GERM8000-signallersignallingtechnician Iss 13
December 2023
Withdrawn
- Impact Assessments 3
Possession of a running line for engineering work
You will need this module if you carry out the duties of a driver or signaller.
GERT8000-T3 Iss 11
December 2023
Withdrawn
- Impact Assessments 1
- Deviations 7
Possession Workers Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
GERM8000-possessionworkers Iss 9
December 2023
Withdrawn
- Impact Assessments 3
Train Driver Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Instructions for use at a vehicular crossing with a telephone (PCR diagram 103)
This document provides design details for CC05 sign - Instructions for use at a vehicular crossing with a telephone (PCR diagram 103).
Sign indicating the penalty for failure to shut a gate at a vehicular crossing (PCR diagram 105)
This document provides design details for CC07 sign - Sign indicating the penalty for failure to shut a gate at a vehicular crossing (PCR diagram…
Reminder at a crossing with user-operated gates (PCR diagram 111)
This document provides design details for CC11 sign - Reminder at a crossing with user-operated gates (PCR diagram 111)
Sign at a vehicular crossing where there are overhead electric wires and the road approaches are on a gradient (PCR diagram 113)
This document provides design details for CC13 sign - Sign at a vehicular crossing where there are overhead electric wires and the road approaches are…
Telephone number
This document provides design details for DA01 sign - Telephone number
Electrical hazard
This document provides design details for BD01 sign - Electrical hazard.
Entering and leaving a GSM-R radio zone marker
This document provides design details for DC01 sign - Entering and leaving a GSM-R radio zone marker.
Combined End of GSM-R and National Radio Network Channel Change Marker
This document provides design details for DC05 sign - Combined end of GSM-R and national radio network channel change marker.
GSM-R signal box phone number short code
This document provides design details for DD03 sign - GSM-R signal box phone number short code.
Signal post telephone - limited clearance label
This document provides design details for DB02 sign - Signal post telephone - limited clearance label.
Document Type
Issue Date
From: To:Code of Practice for Safety Critical Maintenance Elements of Small Plant and Equipment
This Code of Practice details the arrangement for, and safety critical work implications of, the maintenance of small plant and equipment. This has…
COP0010 Iss 2
December 2012
Withdrawn
Code of Practice for Audit Protocol for Supply of Machine / Crane Controllers
This Audit Protocol provides a comprehensive list of questions for an auditor to ask and detailed guidance of what is expected of an auditor whilst…