Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Track Workers Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Work on signalling equipment – duties of the signalling technician
You will need this handbook if you carry out the duties of a signalling technician.
GERT8000-HB19 Iss 4.1
December 2023
Withdrawn
- Impact Assessments 1
Rule Book Module Issue History
This document contains updates to align with changes to Rule Book module issues (GERT8000).
Preparation and movement of trains
You will need this module if you carry out the duties of a driver, guard, shunter, signaller or train preparer.
Dealing with a train accident or train evacuation
You will need this module if you carry out the duties of a driver, guard or signaller.
GERT8000-M1 Iss 6
December 2023
Withdrawn
- Impact Assessments 1
Preparation and working of freight trains
You will need this module if you carry out the duties of the following in relation to freight trains: train driver, guard, shunter, train preparer.
Rule Book Handbook Issue History
This document contains updates to align with changes to Rule Book Handbook issues (GERT8000).
GERT8000 Issue HB Iss 16
December 2023
Withdrawn
- Impact Assessments 1
Train stopped by train failure
You will need this module if you carry out the duties of a driver or signaller.
Passing a signal at danger or an end of authority (EoA) without a movement authority (MA)
You will need this module if you carry out the duties of a: driver, guard, shunter or signaller. You will also need this module if you carry out the…
GERT8000-S5 Iss 10
December 2023
Withdrawn
- Impact Assessments 1
Permissible speed indicators (km/h)
This document provides design details for AD01k sign - Permissible speed indicators (km/h).
Permissible speed indicators (mph)
This document provides design details for AD01m sign - Permissible speed indicators (mph).
Permissible speed indicators (km/h) for limited clearance
This document provides design details for AD02k sign - Permissible speed indicators (km/h) for limited clearance.
Termination of AWS gap
This document provides design details for AA02 sign - Termination of AWS gap.
Commencement of AWS gap
This document provides design details for AA01 sign - Commencement of AWS gap.
Document Type
Issue Date
From: To:Code of Practice Protection of Non PTS Holders at OTM Stabling Points
This Code of Practice concerns all OTM stabling points and can be used when non PTS holders need to visit site. The document has been written to…
Code of Practice for Use and Loading of MEWPs
This Code of Practice details the use of MEWPs, particularly with processes for loads that should safely be permitted in the work platform of a MEWP.…
Injection Injury
This poster details the actions to be taken following a hydraulic injection injury.
Code of Practice for Action to be Taken in the Event of an Accident or Incident Involving OTP
This Code of Practice details the actions to be taken, and by whom, following an accident or incident involving OTP. It deals with the engineering…
COP0019 Iss 5
June 2022
Withdrawn
Code of Practice for Plant Modules on Rail Wagons and Trailers
This Code of Practice identifies the process to be undertaken when plant modules are attached to rail wagons or trailers. This Code of Practice covers…
Code of Practice for Management of Points within Engineering Work Sites
This Code of Practice is to provide guidance on the arrangements for the Management of Points within Engineering Worksites for all rail borne vehicles…
COP0036 Iss 1
June 2022
Withdrawn
Pulling Rail with Road-Rail Excavator Cranes
This Code of Practice provides good practice in the safe pulling of continuous welded rail (CWR) and to minimise the risk of damage to the CWR or…
Code of Practice for OTP Recovery
This Code of Practice details the processes required for the recovery of failed On Track Plant from the infrastructure.