Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Requirements for the Position of Infrastructure and for Defining and Maintaining Clearances
This document sets out requirements for positioning infrastructure and maintaining the position of track relative to infrastructure to achieve gauge…
GIRT7073 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 2
- Deviations 10
Rail Industry Standard for Wheelsets
This document supports GMRT2466 and sets out requirements for the design, manufacture and maintenance of wheelsets and their components.
RIS-2766-RST Iss 1
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Railway Wheelsets
This document sets out requirements for the design, manufacture and maintenance of wheelsets and their components. Access the tread profile…
Managing Train Accident Risk Arising from Train Operations
This document sets out requirements and guidance for the management of train accident risk arising from train operations as part of the GB rail…
RIS-3704-TOM Iss 1
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Corrosion of rail vehicles
This technical note will help those maintaining or repairing rolling stock in detecting, and if appropriate, remedying corrosion. It covers current…
Application of Standard Vehicle Gauges
This document defines standard vehicle gauges and the associated application rules for rolling stock and for infrastructure.
GERT8073 Iss 4
December 2022
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 1
AC Energy Subsystem and Interfaces to Rolling Stock Subsystem
This document sets out requirements for the alternating current (ac) energy subsystem and the interfaces to rolling stock operating over the ac…
GLRT1210 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 52
GLGN1610 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 2
Rolling Stock Subsystem and Interfaces to AC Energy Subsystem
This document sets out interface requirements to the alternating current (ac) energy subsystem for all rolling stock operating over the Great Britain…
GMRT2111 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 3
GMGN2611 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 2
AC Energy Subsystem and Interfaces to Rolling Stock Subsystem
This document sets out requirements and guidance for new, renewed and upgraded ac energy subsystem, and the interfaces to rolling stock and operation…
GLRT1210 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 52
GLGN1610 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 2
Rolling Stock Subsystem and Interfaces to AC Energy Subsystem
This document sets out interface requirements and guidance for the alternating current (ac) energy subsystem for all rolling stock operating over…
GMRT2111 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 3
GMGN2611 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 2
Mind the gap / step
This document provides design details for CA02 sign - Mind the gap / step.
Electrical hazard: warnings to the public
This document provides design details for CB01 sign - Electrical hazard: warnings to the public.
Supplementary sign for level crossings
This document provides design details for CC02 sign - Supplementary sign for level crossings.
Instructions for use at a vehicular crossing without a telephone (PCR diagram 102)
This document provides design details for CC04 sign - Instructions for use at a vehicular crossing without a telephone (PCR diagram 102).
Instructions for use at a vehicular crossing with a telephone (PCR diagram 103)
This document provides design details for CC05 sign - Instructions for use at a vehicular crossing with a telephone (PCR diagram 103).
Document Type
Issue Date
From: To:Code of Practice Planning for the Use of Mobile Operated Plant
This Code of Practice details minimum requirements for planning for the use of mobile operated plant excluding lifting operations. It applies to…
COP0002 Iss 12
September 2023
Withdrawn
Reporting track defects
This poster is provided by the M&EE Networking Group to remind industry that any track defects which could affect plant and equipment safely…
Points run through
This poster is provided by the M&EE Networking Group to remind industry that points run throughs only occur when the rules are not followed.
Code of Practice for Loading of OTP
This Code of Practice gives guidance on the arrangements for loading and securing of typical loads associated with all on-track plant (OTP) whilst on…
Use of Mobile Devices
This poster is provided by the M&EE Networking Group to remind industry of the risks posed by using a mobile phone whilst driving a train. Further…
Code of Practice for Defective OTP Safety Critical Equipment
This Code of Practice details what actions should be undertake when On-Track Plant (OTP) is discovered to have defective safety critical equipment…
Code of Practice for Control of Mobile Communication Equipment use in Driving Cabs
This Code of Practice contains requirements and guidance for the control of mobile communication equipment use in the driving cabs of trains. It sets…
COP0129 Iss 1
June 2023
Withdrawn
Code of Practice for OTM Route Conducting Policy
This Code of Practice contains requirements and guidance for OTM driver’s route conducting or being conducted. Also to assist in the improvement of…
Inspection of Demountable MEWP and Lifting Equipment
This Code of Practice details the arrangements for inspecting MEWPs and lifting equipment in accordance with legislation when attaching to the base…
MEWP Planning
This poster is provided by the M&EE Networking Group to remind industry that all MEWP activities must be properly planned and site specific - even if…