Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Advice to Train Crews - Conveyance of Radioactive Flask
This form is a Network Rail maintained document and is provided as a stand-alone version of the form originally reproduced as an Appendix to GORT3407…
Form RT3973-NUC Iss 1
December 2023
Withdrawn
Duties of the person in charge of the siding possession (PICOS)
You will need this handbook if you carry out the duties of a PICOS.
GERT8000-HB13 Iss 3
December 2023
Withdrawn
- Impact Assessments 1
Track circuit block regulations
You will need this module if you carry out the duties of a signaller in a track circuit block area.
Passing a signal at danger or an end of authority (EoA) without a movement authority (MA)
You will need this module if you carry out the duties of a: driver, guard, shunter or signaller. You will also need this module if you carry out the…
GERT8000-S5 Iss 10
December 2023
Withdrawn
- Impact Assessments 1
Signal Passed at Danger (SPAD) or Train Trip or Unauthorised Movement
For use by signallers in cases of a SPAD being investigated.
Form NR3189 Iss 1
December 2023
Withdrawn
- Impact Assessments 1
Dealing with a train accident or train evacuation
You will need this module if you carry out the duties of a driver, guard or signaller.
GERT8000-M1 Iss 6
December 2023
Withdrawn
- Impact Assessments 1
Train stopped by train failure
You will need this module if you carry out the duties of a driver or signaller.
General signalling regulations
You will need this module if you carry out the duties of a signaller.
Failure of, or work on, signalling equipment - signallers' regulations
You will need this module if you carry out the duties of a signaller.
GERT8000-TS11 Iss 5.1
December 2023
Withdrawn
- Impact Assessments 1
Working of on-track machines (OTM)
You will need this module if you carry out the duties of a driver of an on-track machine, an operator of an on-track machine or a signaller.
GERT8000-OTM Iss 10
December 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Indication of end of cab-signalling
This document provides design details for AB03 sign - Indication of end of cab-signalling.
TVM block marker
This document provides design details for AB04 sign - TVM block marker.
Cab signalling shunt entry board
This document provides design details for AB05 sign - Cab signalling shunt entry board.
Emergency telephone
This document provides design details for DB04 sign - Emergency telephone.
Radio electronic token block: loop clear marker
This document provides design details for AB06 sign - Radio electronic token block: loop clear marker.
Start / end of cab signalling directional arrows
This document provides design details for AB07 sign - Start / end of cab signalling directional arrows.
ETCS stop marker
This document provides design details for AB08 sign - ETCS stop marker.
ETCS block marker passable plate
This document provides design details for AB09 sign - ETCS block marker passable plate.
Temporary speed restriction termination indicator
This document provides design details for AF06 sign - Temporary speed restriction termination indicator.
Controlled signal identification plate
This document provides design details for AC01 sign - Controlled signal identification plate.
Document Type
Issue Date
From: To:Code of Practice Planning for the Use of Mobile Operated Plant
This Code of Practice details minimum requirements for planning for the use of mobile operated plant excluding lifting operations. It applies to…
COP0002 Iss 12
September 2023
Withdrawn
Reporting track defects
This poster is provided by the M&EE Networking Group to remind industry that any track defects which could affect plant and equipment safely…
Points run through
This poster is provided by the M&EE Networking Group to remind industry that points run throughs only occur when the rules are not followed.
Code of Practice for Loading of OTP
This Code of Practice gives guidance on the arrangements for loading and securing of typical loads associated with all on-track plant (OTP) whilst on…
Use of Mobile Devices
This poster is provided by the M&EE Networking Group to remind industry of the risks posed by using a mobile phone whilst driving a train. Further…
Code of Practice for Defective OTP Safety Critical Equipment
This Code of Practice details what actions should be undertake when On-Track Plant (OTP) is discovered to have defective safety critical equipment…
Code of Practice for Control of Mobile Communication Equipment use in Driving Cabs
This Code of Practice contains requirements and guidance for the control of mobile communication equipment use in the driving cabs of trains. It sets…
COP0129 Iss 1
June 2023
Withdrawn
Code of Practice for OTM Route Conducting Policy
This Code of Practice contains requirements and guidance for OTM driver’s route conducting or being conducted. Also to assist in the improvement of…
Inspection of Demountable MEWP and Lifting Equipment
This Code of Practice details the arrangements for inspecting MEWPs and lifting equipment in accordance with legislation when attaching to the base…
MEWP Planning
This poster is provided by the M&EE Networking Group to remind industry that all MEWP activities must be properly planned and site specific - even if…