Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Code of Practice for Hydraulic Hose In-use Repair
This Code of Practice details the action to be taken following the failure of hydraulic hose(s) on an on-track machine (OTM).
Code of Practice for Safe use of Quick Hitches
This Code of Practice identifies the types of quick hitches as categorised by the HSE and details the safety issues and provides safe systems of work…
Code of Practice for OTM Ready to Run Card
This Code of Practice provides guidance on the action to be taken and design of card to show that an applicable on-track machine (OTM) is ready to be…
Code of Practice for Re-railing Kirow Cranes using Outriggers
This Code of Practice provides guidance in the re-railing of Kirow cranes utilising the crane’s outriggers.
Manually propelled equipment in a line blockage
This poster is provided by the M&EE Networking Group to remind industry of the additional measures to take to use manually propelled equipment in a…
Code of Practice for Safe Use of Remote Controls
This Code of Practice identifies the safe use of wired and wireless remote controls for OTP, OTM and other machines in the railway environment. The…
Code of Practice for Haulage Capabilities of On Track Machines
This Code of Practice details the haulage capabilities of on track machines (OTM), it should be followed by any route or operator control when…
Code of Practice for M&EE Documents
This Code of Practice details the process by which the M&EE Networking Group produces documentation and is intended for internal use of the M&EE…
Track System Requirements
This document sets out Great Britain (GB) requirements in scope of the national technical rules for track geometry, track systems and track components…
GCRT5021 Iss 5
March 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 2
- Deviations 8
Switches and Crossings
This document sets out requirements and guidance for new, renewed, and upgraded switches and crossings (S&C) to provide for identification and safe…
GCRT5021 Iss 5
March 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 2
- Deviations 8
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Supplementary sign where crossing is used for animal traffic (PCR diagram 118)
This document provides design details for CC16 sign - Supplementary sign where crossing is used for animal traffic (PCR diagram 118).
Sign CC16 Iss 1
June 2023
Withdrawn
FTAP Flexible Train Arrival Point
A set of four signs to direct engineering trains or on-track machine to locate the required stopping point within a possession or protection zone when…
End of Emergency special Working
This document provides design details for sign AK215 - End of Emergency Special Working
Temporary Speed Restriction Repeater Warning Board
This document provides design details for AF03 sign - Temporary speed restriction repeater warning board.
Open level crossing combined speed restriction / whistleboard
This document provides design details for AH02m sign - Open level crossing combined speed restriction / whistleboard.
Automatic level crossing wrong direction speed restriction board
This document provides design details for AH04m sign - Automatic level crossing wrong direction speed restriction board.
Neutral section warning board
This document provides design details for AJ01 sign - Neutral section warning board.
Document Type
Issue Date
From: To:Code of Practice for Safety Critical Maintenance Elements of Small Plant and Equipment
This Code of Practice details the arrangement for, and safety critical work implications of, the maintenance of small plant and equipment. This has…
COP0010 Iss 2
December 2012
Withdrawn
Code of Practice for Audit Protocol for Supply of Machine / Crane Controllers
This Audit Protocol provides a comprehensive list of questions for an auditor to ask and detailed guidance of what is expected of an auditor whilst…