From: To:Code of Practice for OTM Ready to Run Card
This Code of Practice provides guidance on the action to be taken and design of card to show that an applicable on-track machine (OTM) is ready to be…
Code of Practice for Re-railing Kirow Cranes using Outriggers
This Code of Practice provides guidance in the re-railing of Kirow cranes utilising the crane’s outriggers.
Manually propelled equipment in a line blockage
This poster is provided by the M&EE Networking Group to remind industry of the additional measures to take to use manually propelled equipment in a…
Code of Practice for Safe Use of Remote Controls
This Code of Practice identifies the safe use of wired and wireless remote controls for OTP, OTM and other machines in the railway environment. The…
Code of Practice for Haulage Capabilities of On Track Machines
This Code of Practice details the haulage capabilities of on track machines (OTM), it should be followed by any route or operator control when…
Code of Practice for M&EE Documents
This Code of Practice details the process by which the M&EE Networking Group produces documentation and is intended for internal use of the M&EE…
Track System Requirements
This document sets out Great Britain (GB) requirements in scope of the national technical rules for track geometry, track systems and track components…
GCRT5021 Iss 5
March 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 2
- Deviations 8
Switches and Crossings
This document sets out requirements and guidance for new, renewed, and upgraded switches and crossings (S&C) to provide for identification and safe…
GCRT5021 Iss 5
March 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 2
- Deviations 8
Rule Book Briefing Leaflet
Each issue of the Rule Book Briefing Leaflet contains a summary of the changes being introduced to GERT8000.
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Management of Control Command and Signalling (CCS) Subsystem Failures, Faults and Defects
This document sets out the management process requirements that apply to safety related failures of control command and signalling (CCS) onboard and…
RIS-0707-CCS Iss 1
September 2023
Withdrawn
- Briefing Notes: 1
- Technical Notes 1
Rail Vehicle Structures and Passive Safety
This document sets out requirements for the design and integrity of primary and secondary rail vehicle structures, including interior crashworthiness.
GMRT2100 Iss 6.1
June 2023
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Lineside Operational Signs - Product Requirements
This document sets of the requirements of lineside operational signs that support technical compatibility with rail vehicle exterior lighting and…
GIRT7033 Iss 4
June 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 1
Axle Bearing Condition Monitoring
This document sets out requirements and guidance for condition monitoring of axle bearings, whether by trackside or onboard detection systems.
GEGN8614 Iss 1
June 2023
Withdrawn
- Briefing Notes: 1
GERT8014 Iss 2
June 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 1
- Deviations 1
Urgent High-Risk Defect Report Form
In the event that the NIR-Online system is unavailable, details of urgent high-risk defects, faults and failures shall be shared by completing and…
Assessment of Passenger Seat Comfort
This document gives guidance on the assessment of static comfort for passenger seats on rolling stock. It includes criteria to measure aspects of a…
Movement of Continental Wagons on the GB Network
RIS-2770-RST Iss 1 sets out requirements and guidance around the process of registering and assessing compatibility of wagons not registered in GB for…
RIS-2770-RST Iss 1
June 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Guidance on Operational Railway Safety Awareness
This document is aimed at Railway Undertakings and any other railway actors operating in or around the railway environment. It gives guidance on…
ERTMS/ETCS Baseline 3 Onboard Subsystem Requirements
This document sets out the industry agreed requirements and guidance for the Great Britain (GB) application of the ERTMS/ETCS Baseline 3 onboard…
RIS-0797-CCS Iss 1
June 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
RIS-0798-CCS Iss 1
June 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Changes to National Operations Publications for March 2024
This document is primarily used to publish minor changes to National Operations Publications (NOPs) and has been re-issued, taking into consideration…
Driver’s Single Line Working Ticket
This form should be used by the driver when single line working applies.
Rule Book Briefing Leaflet
Each issue of the Rule Book Briefing Leaflet contains a summary of the changes being introduced to GERT8000.
Possession of a running line for engineering work
You will need this module if you carry out the duties of a driver or signaller.
GERT8000-T3 Iss 11
December 2023
Withdrawn
- Impact Assessments 1
- Deviations 7
Possession Workers Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
GERM8000-possessionworkers Iss 9
December 2023
Withdrawn
- Impact Assessments 3
Train Driver Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Master manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Signaller and Signalling Technician Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
GERM8000-signallersignallingtechnician Iss 13
December 2023
Withdrawn
- Impact Assessments 3
Rule Book Module Issue History
This document contains updates to align with changes to Rule Book module issues (GERT8000).
Start / end of cab signalling directional arrows
This document provides design details for AB07 sign - Start / end of cab signalling directional arrows.
ETCS stop marker
This document provides design details for AB08 sign - ETCS stop marker.
ETCS block marker passable plate
This document provides design details for AB09 sign - ETCS block marker passable plate.
Temporary speed restriction termination indicator
This document provides design details for AF06 sign - Temporary speed restriction termination indicator.
Controlled signal identification plate
This document provides design details for AC01 sign - Controlled signal identification plate.
Distant signal sign and identification plate
This document provides design details for AC02 sign - Distant signal sign and identification plate.
Temporary speed restriction AWS cancelling indicator
This document provides design details for AF08 sign - Temporary speed restriction AWS cancelling indicator.
Automatic signal sign and identification plate
This document provides design details for AC03 sign - Automatic signal sign and identification plate.
Worksite entrance marker
This document provides design details for AG02 sign - Worksite entrance marker.
Level crossing warning sign
This document provides design details for AH01 sign - Level crossing warning sign.