Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Code of Practice for Plant Any Line Open (ALO) Working
This Code of Practice provides guidance on how to safely manage Plant Any Line Open (ALO) working.
Code of Practice for Hydraulic Hose In-use Repair
This Code of Practice details the action to be taken following the failure of hydraulic hose(s) on an on-track machine (OTM).
Code of Practice for Safe use of Quick Hitches
This Code of Practice identifies the types of quick hitches as categorised by the HSE and details the safety issues and provides safe systems of work…
Code of Practice for OTM Ready to Run Card
This Code of Practice provides guidance on the action to be taken and design of card to show that an applicable on-track machine (OTM) is ready to be…
Code of Practice for Re-railing Kirow Cranes using Outriggers
This Code of Practice provides guidance in the re-railing of Kirow cranes utilising the crane’s outriggers.
Manually propelled equipment in a line blockage
This poster is provided by the M&EE Networking Group to remind industry of the additional measures to take to use manually propelled equipment in a…
Code of Practice for Safe Use of Remote Controls
This Code of Practice identifies the safe use of wired and wireless remote controls for OTP, OTM and other machines in the railway environment. The…
Code of Practice for Haulage Capabilities of On Track Machines
This Code of Practice details the haulage capabilities of on track machines (OTM), it should be followed by any route or operator control when…
Code of Practice for M&EE Documents
This Code of Practice details the process by which the M&EE Networking Group produces documentation and is intended for internal use of the M&EE…
Track System Requirements
This document sets out Great Britain (GB) requirements in scope of the national technical rules for track geometry, track systems and track components…
GCRT5021 Iss 5
March 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 2
- Deviations 8
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:AC Energy Subsystem and Interfaces to Rolling Stock Subsystem
This document sets out requirements and guidance for new, renewed and upgraded ac energy subsystem, and the interfaces to rolling stock and operation…
GLRT1210 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 52
GLGN1610 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 2
Rolling Stock Subsystem and Interfaces to AC Energy Subsystem
This document sets out interface requirements and guidance for the alternating current (ac) energy subsystem for all rolling stock operating over…
GMRT2111 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 3
GMGN2611 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 2
ERTMS National Identities Management
This document sets out the requirements for arrangements for the management of the ERTMS National Identities on the GB mainline railway.
GERT8072 Iss 1
March 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
- Amendments: 1
Train front-end visibility requirements and safe integration
This technical note clarifies the application of standards and legislation for front-end visibility and safe integration of rolling stock within the…
Trespass Risk Assessment
This document provides a common framework for trespass risk assessments, developed from the outputs of RSSB research project T1183 - Good practice…
Process for Adding, Removing or Modifying Lettered Differential Permissible Speeds
This document sets out requirements and guidance to support the process of adding, removing or modifying a Lettered Differential Permissible Speed…
Route Level Assessment of Technical Compatibility between Vehicles and Infrastructure
This document sets out requirements and responsibilities for the assessment of technical compatibility at route level for vehicles and infrastructure.
RIS-8270-RST Iss 1
September 2022
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Passenger Train Dispatch and Platform Safety Measures
This document sets out requirements and guidance for the development, review and implementation of passenger train dispatch processes and measures to…
RIS-3703-TOM Iss 4.1
September 2022
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
Defective On-Train Equipment
This document sets out requirements to be applied when on-train equipment becomes defective and provides guidance to assist the railway undertakings…
RIS-3437-TOM Iss 2
September 2022
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 1
Station duties and train dispatch
You will need this module if you carry out the duties of a driver, a guard, a person in charge (PIC) of dispatch or staff responsible for train…
Defective or isolated vehicles and on-train equipment
You will need this module if you carry out the duties of a driver, guard, signaller or train preparer. It sets out the operational instructions to be…
GERT8000-TW5 Iss 11
December 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Preparation and movement of trains
You will need this module if you carry out the duties of a driver, guard, shunter, signaller or train preparer.
Deviation for countdown markers
This document provides design details for DEV-AK102-01 sign - Deviation for station approach countdown markers Applicable to the South West Trains…
Termination of special AWS working
This document provides design details for AA04 sign - Termination of special AWS working.
Permanently installed AWS cancelling indicator
This document provides design details for AA05 sign - Permanently installed AWS cancelling indicator
Warning of the start of cab-signalling
This document provides design details for AB01 sign - Warning of the start of cab-signalling.
Indication of start of cab-signalling
This document provides design details for AB02 sign - Indication of start of cab-signalling.
Indication of end of cab-signalling
This document provides design details for AB03 sign - Indication of end of cab-signalling.
TVM block marker
This document provides design details for AB04 sign - TVM block marker.
Cab signalling shunt entry board
This document provides design details for AB05 sign - Cab signalling shunt entry board.
Emergency telephone
This document provides design details for DB04 sign - Emergency telephone.
Radio electronic token block: loop clear marker
This document provides design details for AB06 sign - Radio electronic token block: loop clear marker.