Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Freight coupler loads
This technical note will help industry assess the ability of a locomotive to haul loads over a route. It focuses on coupler load capacity and…
Changes to National Operations Publications for March 2024
This document is primarily used to publish minor changes to National Operations Publications (NOPs) and has been re-issued, taking into consideration…
Driver’s Single Line Working Ticket
This form should be used by the driver when single line working applies.
Guidance on the Application of the Control of Electromagnetic Fields at Work Regulations
This document gives guidance on the application of the Control of Electromagnetic Fields at Work Regulations in the railway environment, and…
GLGN1620 Iss 1
March 2024
Withdrawn
- Briefing Notes: 1
On-Train Camera Monitoring Systems
This document sets out requirements for the installation and use of modern camera systems for the purposes of recording, storing, and accessing video…
RIS-2712-RST Iss 1.1
March 2024
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Infrastructure Based Train Detection Interface Requirements
This standard specifies the infrastructure based train detection system parameters that are necessary to support technical compatibility with GB…
GKRT0028 Iss 3.1
March 2024
Withdrawn
- Briefing Notes: 1
On-Track Plant, Trolleys and Associated Equipment
This document sets out requirements and guidance for engineering of on-track plant, trolleys and associated equipment.
RIS-1530-PLT Iss 7
March 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Technical Notes 1
Compliance with noise and vibration legislation
This technical note sets out the relevant railway-specific legislation on noise and vibration. It will help familiarise organisations with their…
Code of Practice for Action following Hydraulic Pump and/or Motor Failure
This Code of Practice details the details the action to be taken following the failure of an hydraulic pump and/or motor on an on-track machine (OTM).
COP0039 Iss 1
March 2024
Withdrawn
Code of Practice for Plant Any Line Open (ALO) Working
This Code of Practice provides guidance on how to safely manage Plant Any Line Open (ALO) working.
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Drugs and alcohol testing for safety-critical workers
This document provides transport operators with the industry-agreed standard for testing safety-critical workers for drugs and alcohol. It contains…
RIS-8070-TOM Iss 1
March 2022
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
GEGN8570 Iss 2
March 2022
Withdrawn
- Briefing Notes: 1
Accident and Incident Investigation
This document sets out requirements and guidance for the investigation of adverse events involving more than one duty holder so that system…
RIS-3119-TOM Iss 2.2
March 2022
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Provisional SPAD Data Collection Form (Railway Undertaking)
Infrastructure managers and railway undertakings shall use the GORT3119 designated Provisional SPAD Data Collection forms when investigating signals…
Form RT3119-B Iss 8
December 2021
Withdrawn
Provisional ERTMS SPAD Data Collection Form (Railway Undertaking)
Infrastructure managers and railway undertakings shall use the RT3119 designated Provisional SPAD Data Collection forms when investigating signals…
Form RT3119-D Iss 3
December 2021
Withdrawn
Data Recorders on Trains
This document sets out engineering requirements and guidance for the provision and functionality of data recorders on trains.
RIS-2472-RST Iss 1
December 2021
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Vehicle Registration, Marking and Numbering
This document sets out requirements for the registration, marking and numbering of rail vehicles operating on the Great Britain (GB) mainline…
RIS-2453-RST Iss 2
December 2021
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Supplier Assurance
This document is a standard for the generation of supplier assurance during the procurement cycle for products and services, for use in the GB rail…
RIS-2750-RST Iss 1
December 2021
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Guidance Note on the Management of Electrical Risk Related to Operational Tasks on Electrified Lines
This document provides railway undertakings and infrastructure managers (station operators) with guidance on the management and assessment of…
Engineering Design of On-Track Machines in Running Mode
This document sets out requirements for the design of on-track machines (OTMs) in running mode.
GMRT2400 Iss 6.1
December 2021
Withdrawn
- Briefing Notes: 1
Changes to National Operations Publications for March 2024
This document is primarily used to publish minor changes to National Operations Publications (NOPs) and has been re-issued, taking into consideration…
Driver’s Single Line Working Ticket
This form should be used by the driver when single line working applies.
Rule Book Briefing Leaflet
Each issue of the Rule Book Briefing Leaflet contains a summary of the changes being introduced to GERT8000.
Possession of a running line for engineering work
You will need this module if you carry out the duties of a driver or signaller.
GERT8000-T3 Iss 11
December 2023
Withdrawn
- Impact Assessments 1
- Deviations 7
Train Driver Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Master manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Possession Workers Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
GERM8000-possessionworkers Iss 9
December 2023
Withdrawn
- Impact Assessments 3
Signaller and Signalling Technician Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
GERM8000-signallersignallingtechnician Iss 13
December 2023
Withdrawn
- Impact Assessments 3
Rule Book Module Issue History
This document contains updates to align with changes to Rule Book module issues (GERT8000).
Supplementary sign where crossing is used for animal traffic (PCR diagram 118)
This document provides design details for CC16 sign - Supplementary sign where crossing is used for animal traffic (PCR diagram 118).
Sign CC16 Iss 1
June 2023
Withdrawn
FTAP Flexible Train Arrival Point
A set of four signs to direct engineering trains or on-track machine to locate the required stopping point within a possession or protection zone when…
End of Emergency special Working
This document provides design details for sign AK215 - End of Emergency Special Working
Temporary Speed Restriction Repeater Warning Board
This document provides design details for AF03 sign - Temporary speed restriction repeater warning board.
Open level crossing combined speed restriction / whistleboard
This document provides design details for AH02m sign - Open level crossing combined speed restriction / whistleboard.
Automatic level crossing wrong direction speed restriction board
This document provides design details for AH04m sign - Automatic level crossing wrong direction speed restriction board.
Neutral section warning board
This document provides design details for AJ01 sign - Neutral section warning board.