Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Code of Practice for M&EE Documents
This Code of Practice details the process by which the M&EE Networking Group produces documentation and is intended for internal use of the M&EE…
Track System Requirements
This document sets out Great Britain (GB) requirements in scope of the national technical rules for track geometry, track systems and track components…
GCRT5021 Iss 5
March 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 2
- Deviations 8
Switches and Crossings
This document sets out requirements and guidance for new, renewed, and upgraded switches and crossings (S&C) to provide for identification and safe…
GCRT5021 Iss 5
March 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 2
- Deviations 8
Rolling stock – cyber security essentials
This technical note will help industry to identify cyber security control measures, which may be put in place when designing a new component or…
Master manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Rule Book Briefing Leaflet
Each issue of the Rule Book Briefing Leaflet contains a summary of the changes being introduced to GERT8000.
Signaller and Signalling Technician Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
GERM8000-signallersignallingtechnician Iss 13
December 2023
Withdrawn
- Impact Assessments 3
Possession of a running line for engineering work
You will need this module if you carry out the duties of a driver or signaller.
GERT8000-T3 Iss 11
December 2023
Withdrawn
- Impact Assessments 1
- Deviations 7
Possession Workers Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
GERM8000-possessionworkers Iss 9
December 2023
Withdrawn
- Impact Assessments 3
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Lineside telephone
This document provides design details for DB03 sign - Lineside telephone.
Telephone for routine use by railway staff
This document provides design details for DB06 sign - Telephone for routine use by railway staff.
Cab secure radio channel change marker
This document provides design details for DC02 sign - Cab secure radio channel change marker.
RETB channel change marker
This document provides design details for DC04 sign - RETB channel change marker.
Entering and leaving an IVRS zone marker
This document provides design details for DC06 sign - Entering and leaving an IVRS zone marker.
GSM-R signal box phone number sign
This document provides design details for DD02 sign - GSM-R signal box phone number.
Deviation for countdown markers
This document provides design details for DEV-AK102-01 sign - Deviation for station approach countdown markers Applicable to the South West Trains…
Limited clearance sign
This document provides design details for BA04 sign - Limited clearance sing.
Temporary speed restriction directional arrows
This document provides design details for AF05 sign - Temporary speed restriction directional arrows.
Temporary speed restriction spate indicator
This document provides design details for AF07 sign - Temporary speed restriction spate indicator.
Document Type
Issue Date
From: To:Code of Practice for the Independence and Competence of LOLER Through Examiners
This document details the various minimum requirements for independence of the examiner for thorough examination of lifting equipment and accessories…