Recently, RSSB’s in-house SMIS development team have been liaising with the SMIS data entry users and the SMIS Advisory Group to identify how the layout of the personal accident and injury forms can be improved. The aim is to reduce the time needed to enter these events into SMIS. This should be implemented in summer 2020 (date to be confirmed). The improved form design will remove about 75% of the existing fields.