GIRT7006 Iss 1
Prevention and Mitigation of Overruns - Risk Assessment
Synopsis
This document defines the requirements for risk assessment of the design and operational use of track and signalling, so as to control the risks associated with trains exceeding the end of their movement authority.
Read full standard
Registered
Withdrawn
Railway Group Standard
- Issued:
- 01/12/2000
- Published:
- 02/12/2000
- In Force:
- 07/04/2001
- Withdrawn:
- 06/12/2014
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Supersedes | GKRT0078 Iss 5 |
Superseded By | RIS-0386-CCS Iss 1 |
Lead Committee | Control Command and Signalling - CCS |
Supporting Committee | Infrastructure - INS; Traffic Operation and Management - TOM |
Briefing Notes | 01 BN06; 14 BN16 |
Impact Assessments
Registered |
00 IA18 |
Supporting Documents | GIGN7606 Iss 1 |
Deviations
Registered |
09-191-DGN
Elimination of Simple Signals from Risk Assessments
05-143-TNC
Prevention and Mitigation of Overruns - Risk Assessment |