Menu

RIS-0703-CCS Iss 1.1

Signalling Layout and Signal Aspect Sequence Requirements

Synopsis

This document sets out requirements for the lineside signalling system to be compatible with train operations and guidance on their application.

Summary Of Changes

This document has been reissued from version 1 to 1.1 to correct formatting only. There are no changes to the content. The intent of RIS-0703-CCS issue one is to provide the industry with requirements for integrating the lineside signalling system with train operations and guidance on their application. Conformity with the requirements is consistent with providing the lineside signaling system that is driveable. The requirements are derived from the historical practice on the GB mainline railway.

12 mnth review - The content of this document will be reviewed under an existing or future project.

Optional reading and resources:

Driveability

Read full standard
register-icon
Registered
Withdrawn
Rail Industry Standard
Issued:
13/03/2018
Published:
14/03/2018
In Force:
13/03/2018
Withdrawn:
02/09/2023
Last Review:
09/05/2019
Next Review:
01/03/2024

Details

Consultation Status Closed
Vehicle Assessment No
Supersedes RIS-0703-CCS Iss 1, GERT8071 Iss 2, GEGN8571 Iss 2, GKRT0045 Iss 5, GKGN0645 Iss 5
Superseded By RIS-0703-CCS Iss 2
Lead Committee Control Command and Signalling - CCS
Supporting Committee Rolling Stock - RST; Traffic Operation and Management - TOM
Briefing Notes 18 BN01
Impact Assessments
register-icon
Registered
18 IA01; 18 IA02
Amendments
register-icon
Registered
0703-RIS Iss 11 AM001
Deviations
register-icon
Registered
22-090-DEV

ECML Welwyn to Hitchin Deficient Signal Spacing