Menu

GERT8071 Iss 2

Proceed-on-Sight Authorities

Synopsis

This document mandates the requirements for the degraded mode signalling facility, known as a Proceed-on-Sight Authority (PoSA).

Summary Of Changes

Superseded in part by RIS-0703-CCS Iss 1; and in part by RIS-0713-CCS Iss 1 (Clause 2.1.1.2).
Read full standard
register-icon
Registered
Withdrawn
Railway Group Standard
Issued:
01/12/2011
Published:
03/12/2011
In Force:
03/03/2012
Withdrawn:
03/03/2018

Details

Consultation Status Closed
Vehicle Assessment No
Supersedes GERT8071 Iss 1
Superseded By RIS-0703-CCS Iss 1, RIS-0713-CCS Iss 1, RIS-0713-CCS Iss 1.1
Lead Committee Control Command and Signalling - CCS
Supporting Committee Traffic Operation and Management - TOM
Briefing Notes 11 BN30; 18 BN01
Impact Assessments
register-icon
Registered
11 IA20; 18 IA01; 18 IA02
Supporting Documents GEGN8571 Iss 2