GERT8000-T10 Iss 5
Duties of a designated person (DP) and people working on rail vehicles
Synopsis
You will need this module if you carry out the duties of a designated person or person working on a rail vehicle.
Summary Of Changes
Sections 7.2 and 7.5 have been revised to introduce a requirement for the signaller to issue an authority number as part of confirmation that the line has been blocked, and to quote this when giving up the blockage, when a designated person (DP) is walking with a group to or from a failed train on a running line.
Read full standard

Registered
Withdrawn
Rule Book Modules:
Track and signalling work (T)
- Issued:
- 04/09/2021
- Published:
- 04/09/2021
- In Force:
- 04/12/2021
- Withdrawn:
- 03/12/2022
- Next Review:
- 04/12/2022
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Supersedes | GERT8000-T10 Iss 4 |
Superseded By | GERT8000-T10 Iss 6 |
Lead Committee | Traffic Operation and Management - TOM |
Supporting Committee | Rolling Stock - RST; Plant - PLT |
Impact Assessments
![]() Registered |
21 IA13 |
Supporting Documents | GERT8000-RBBL Iss 36 ; GERT8000-Issue Iss 33 |