Menu

GSSIN058 Iss 1

P Series Relay Armature Bolts

Synopsis

This document requires that all 'p' series relays reserviced at crewe service centre form September 1990 to April 1991 be examined and changed if the armature bolt tab washer is not correctly installed. This document may be ordered individually or as part of the complete handbook.
Read full standard
register-icon
Registered
Withdrawn
Railway Group Standard
Issued:
01/11/1993
Published:
01/11/1993
In Force:
01/11/1993
Withdrawn:
31/12/1999

Details

Consultation Status Closed
Vehicle Assessment No
Superseded By GKRT0404 Iss 1
Lead Committee Control Command and Signalling - CCS