Menu

RIS-3708-TOM Iss 2

Arrangements Concerning the Non-Operation of Track Circuits During the Leaf Fall Contamination Period

Synopsis

This document details the requirements for identifying the need for, introduction and subsequent removal of, restrictions to normal operations to mitigate the effects of the non-operation of track circuits during the leaf fall contamination period.

Summary Of Changes

A correction has been made to specify special working arrangements (SWA) be implemented following ‘more than two’ occurrences, clarification has been made to better distinguish between the requirements and guidance on options for implementing SWA, and guidance included on defining an ‘occurrence’.

12 mnth review - No further action required.

Read full standard
register-icon
Registered
Live
Rail Industry Standard
Issued:
02/09/2017
Published:
02/09/2017
In Force:
02/09/2017
Last Review:
05/03/2019
Next Review:
01/09/2023

Details

Consultation Status Open
Consultation due 19/01/2024
Consultation sign-up Consultation sign up
Consultation Link Consultation Link
Vehicle Assessment No
Supersedes RIS-3708-TOM Iss 1
Lead Committee Traffic Operation and Management - TOM
Supporting Committee Control Command and Signalling - CCS
Briefing Notes 17 BN15
Impact Assessments
register-icon
Registered
17 IA17