RIS-3708-TOM Iss 2
Arrangements Concerning the Non-Operation of Track Circuits During the Leaf Fall Contamination Period
Synopsis
This document details the requirements for identifying the need for, introduction and subsequent removal of, restrictions to normal operations to mitigate the effects of the non-operation of track circuits during the leaf fall contamination period.
Summary Of Changes
A correction has been made to specify special working arrangements (SWA) be implemented following ‘more than two’ occurrences, clarification has been made to better distinguish between the requirements and guidance on options for implementing SWA, and guidance included on defining an ‘occurrence’.
12 mnth review - No further action required.
02/07/2024 - TOM SC at its meeting on 28 May 2024 approved report recommendation that a change project is initiated.
Read full standard

Registered
Live
Rail Industry Standard
- Issued:
- 02/09/2017
- Published:
- 02/09/2017
- In Force:
- 02/09/2017
- Last Review:
- 28/05/2024
- Next Review:
- 02/09/2028
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Supersedes | RIS-3708-TOM Iss 1 |
Lead Committee | Traffic Operation and Management - TOM |
Supporting Committee | Control Command and Signalling - CCS |
Briefing Notes | 17 BN15 |
Impact Assessments
![]() Registered |
17 IA17 |