Menu

RIS-3708-TOM Iss 1

Arrangements Concerning the Non-Operation of Track Circuits During the Leaf Fall Contamination Period

Synopsis

This document details the requirements for identifying the need for, introduction and subsequent removal of, restrictions to normal operations to mitigate the effects of the non-operation of track circuits during the leaf fall contamination period.

Summary Of Changes

The key changes made to the requirements transferred to RIS-3708-TOM Iss 1 are that four requirements have been withdrawn and seven requirements have been amended. This is to provide clarification in meaning, better align with Network Rail's internal standards and to encompass ERTMS fitted railways. Superseded by RIS-3708-TOM Iss 2 with effect from 02/09/2017
Read full standard
register-icon
Registered
Withdrawn
Rail Industry Standard
Issued:
04/06/2016
Published:
04/06/2016
In Force:
04/06/2016
Withdrawn:
02/09/2017

Details

Consultation Status Closed
Vehicle Assessment No
Supersedes GORT3208 Iss 3
Superseded By RIS-3708-TOM Iss 2
Lead Committee Traffic Operation and Management - TOM
Supporting Committee Control Command and Signalling - CCS
Briefing Notes 16 BN10; 17 BN15
Impact Assessments
register-icon
Registered
16 IA08; 17 IA17