Sign AJ07 Iss 1
Changeover to Overhead Electric Traction
Synopsis
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Summary Of Changes
To introduce sign AJ07 ‘Changeover to overhead electric traction’ to the signs catalogue. The sign means raise pantograph.
The new sign forms part of a suite of standards changes relating to the introduction of new permanent and temporary power changeover signs applicable to multi-mode trains. It is anticipated that this suite of changes will make some contribution to reducing the number of failed changeovers.
Read full standard

Registered
Live
Lineside Operational Signs:
Electrical Traction Signs
- Issued:
- 01/03/2025
- Published:
- 01/03/2025
- Next Review:
- 01/03/2026
Details
Vehicle Assessment | No |
Associated Standard | RIS-0733-CCS Iss 1.3, RS521 Iss 8, RIS-3784-TOM Iss 2 |
Lead Committee | Control Command and Signalling - CCS |
Supporting Committee | Traffic Operation and Management - TOM; Rolling Stock - RST |
Impact Assessments
![]() Registered |
25 IA08 |