COP0008 Iss 6
Code of Practice for Tandem Lifting with Two Excavator Cranes
Synopsis
This Code of Practice details the control measures to be applied when using two excavator cranes to lift a load simulatneously. It applies to the use of two excavator cranes which normally lift loads independently but which are required to occasionally lift a load in conjunction with another similar excavator crane using a process known as Tandem Lifting. This Code of Practice applies to both road and rail lifting operationgs.
Withdrawn
M and EE Networking Group:
Code of Practice
- Issued:
- 16/09/2015
- Published:
- 05/12/2015
- In Force:
- 05/12/2015
- Withdrawn:
- 01/03/2025
Details
Vehicle Assessment | No |
Supersedes | COP0008 Iss 5 |
Superseded By | COP0008 Iss 7 |