COP0008 Iss 5
Code of Practice for Tandem Lifting with Two Excavator Cranes
Synopsis
This Code of Practice details the control measures to be applied when using two excavator cranes to lift a load simultaneously. It applies to the use of two excavator cranes which normally lift loads independently but which are required to occasionally lift a load in conjunction with another similar excavator crane using a process known as Tandem Lifting. This Code of Practice applies to both road and rail lifting operations.
Withdrawn
M and EE Networking Group:
Code of Practice
- Issued:
- 01/05/2012
- Published:
- 01/09/2012
- In Force:
- 01/09/2012
- Withdrawn:
- 05/12/2015
Details
Vehicle Assessment | No |
Supersedes | COP0008 Iss 4 |
Superseded By | COP0008 Iss 6 |