"> ">
Menu

COP0008 Iss 5

Code of Practice for Tandem Lifting with Two Excavator Cranes

Synopsis

This Code of Practice details the control measures to be applied when using two excavator cranes to lift a load simultaneously. It applies to the use of two excavator cranes which normally lift loads independently but which are required to occasionally lift a load in conjunction with another similar excavator crane using a process known as Tandem Lifting. This Code of Practice applies to both road and rail lifting operations.
Withdrawn
M and EE Networking Group: Code of Practice
Issued:
01/05/2012
Published:
01/09/2012
In Force:
01/09/2012
Withdrawn:
05/12/2015

Details

Vehicle Assessment No
Supersedes COP0008 Iss 4
Superseded By COP0008 Iss 6