RIS-0797-CCS Iss 1
ERTMS/ETCS Baseline 3 Onboard Subsystem Requirements: Retrofit
Synopsis
This document sets out the industry agreed requirements and guidance for the Great Britain (GB) application of the ERTMS/ETCS Baseline 3 onboard subsystem to existing rail vehicles (retrofit projects) that operate on the GB mainline railway.
Summary Of Changes
RIS-0797-CCS is a new Rail Industry Standard. The original requirements were drafted and published by Digital Railway. Any material changes to the original DR requirements have been provided in the Briefing Note.
12 mnth review - The content of this document will be reviewed as part of an existing or future project.
Optional reading and resources:
Read full standard

Registered
Withdrawn
Rail Industry Standard
- Issued:
- 01/09/2018
- Published:
- 01/09/2018
- In Force:
- 01/09/2018
- Withdrawn:
- 03/06/2023
- Last Review:
- 17/12/2020
- Next Review:
- 01/09/2024
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Superseded By | RIS-0799-CCS Iss 1 |
Lead Committee | Control Command and Signalling - CCS |
Supporting Committee | Rolling Stock - RST; Plant - PLT |
Briefing Notes | 18 BN21 |
Impact Assessments
![]() Registered |
18 IA23 |