GERT8000-HB7 Iss 8
General duties of a controller of site safety (COSS)
Synopsis
Summary Of Changes

- Issued:
- 04/09/2021
- Published:
- 04/09/2021
- In Force:
- 04/12/2021
- Withdrawn:
- 07/12/2024
- Last Review:
- 25/07/2023
- Next Review:
- 03/12/2027
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Supersedes | GERT8000-HB7 Iss 7 |
Superseded By | GERT8000-HB7 Iss 9 |
Lead Committee | Traffic Operation and Management - TOM |
Supporting Committee | Control Command and Signalling - CCS; Plant - PLT |
Impact Assessments
![]() Registered |
21 IA13 |
Supporting Documents | GERT8000-RBBL Iss 36 ; GERT8000-Issue HB Iss 14 |
Deviations
![]() Registered |
22-101-Dev Revised 05-11-2024
deviation
24-022-DEV
The use of T3-A as a process for the protection of T3 possessions on Network Rail managed infrastructure
24-004-DEV
The use of secondary protection for T3 possessions
23-034-DEV
Deviation from the accepted list of activities that can be undertaken without the line being blocked when using a Planned Crossing Point
22-101-DEV Revised 05-03-2024
The use of signal disconnection as secondary protection for T3 possessions - National Deviation
22-101-DEV Revised 13-12-2023
The use of signal disconnection as secondary protection for T3 possessions
23-040-DEV
Possession Optimisation - enabling clearer safety communications in possessions through web-enabled devices
23-020-DEV
Deviation; rule book
22-101-DEV Revised 03-07-2023
The use of signal disconnection as secondary protection for T3 possessions
22-101-DEV Revised 09-02-2023
The use of signal disconnection as secondary protection for T3 possessions
22-101-DEV
The use of signal disconnection as secondary protection for T3 possessions |