Menu

GERT8000-TS3 Iss 7

Absolute block regulations

Synopsis

You will need this module if you carry out the duties of a signaller in an absolute block area.

Summary Of Changes

Regulation 3.1.4 has been revised to regulation has been changed to state when the 'is line clear' signal can be sent. 

Regulation 3.6.1 has been revised to explain that 'blocking back inside home signal' must be applied not only when there is a work-site marker board for a T3 possession obstructing the line within the clearing point, but also when there is work that will make the line unsafe within that work site. 

Most of the wording in Regulation 3.6, Part C, ‘Blocking the line for protection of staff or work’, has been revised to explain the procedure in detail, and a new diagram included to illustrate this. 

Regulation 10.5 has been revised to replace incorrect cross references to modules T3 and TS1 by a correct reference to Signal Box Special Instructions.

 
Read full standard
register-icon
Registered
Withdrawn
Rule Book Modules: Train signalling (TS)
Issued:
04/09/2021
Published:
04/09/2021
In Force:
04/12/2021
Withdrawn:
03/12/2022
Next Review:
04/12/2022

Details

Consultation Status Closed
Vehicle Assessment No
Supersedes GERT8000-TS3 Iss 6
Superseded By GERT8000-TS3 Iss 7.1
Lead Committee Traffic Operation and Management - TOM
Supporting Committee Control Command and Signalling - CCS
Impact Assessments
register-icon
Registered
21 IA13
Supporting Documents GERT8000-RBBL Iss 36 ; GERT8000-Issue Iss 33
Deviations
register-icon
Registered
21-024-DEV Revised 25-10-2022

Possession of a running line for engineering work

21-024-DEV Revised 9-11-2021

Possession of a running line for engineering work

21-024-DEV

Possession of a running line for engineering work