COP0002 Iss 9
Code of Practice for Planning for the Use of Mobile Operated Plant
Synopsis
This Code of Practice details the minimum planning requirements for use of all plant on or near the line. This COP details the planning arrangements for the use of the plant but does not include lifting operations, which is in a separate COP (COP0011).
Summary Of Changes
Superseded by COP0002 Iss 10
Withdrawn
M and EE Networking Group:
Code of Practice
- Issued:
- 30/10/2015
- Published:
- 05/12/2015
- In Force:
- 05/12/2015
- Withdrawn:
- 03/03/2018
Details
Vehicle Assessment | No |
Supersedes | COP0002 Iss 8 |
Superseded By | COP0002 Iss 10 |