COP0005 Iss 5

Code of Practice for Handling Serviceable Rail with RRV Excavator Cranes Including Thimbling

Synopsis

This Code of Practice details the equipment and working practices for handling and thimbling of serviceable rail, using RRV excavator cranes, to minimise the risk of personnel and damage to the rail. These recommendations can also be used for handling scrap rail where the risk to personnel is the same as handling serviceable rail but the damage to the rail is not so critical. There is also a section on how to deal with rail on its side.
Withdrawn
M and EE Networking Group: Code of Practice
Issued:
13/05/2015
Published:
05/09/2015
In Force:
05/09/2015
Withdrawn:
07/12/2019

Details

Vehicle Assessment No
Supersedes COP0005 Iss 4
Superseded By COP0005 Iss 6