GIRT7012 Iss 1
Requirements for Level Crossings
Synopsis

- Issued:
- 01/08/2004
- Published:
- 07/08/2004
- In Force:
- 02/10/2004
- Withdrawn:
- 03/04/2010
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Supersedes | GCRT5208 Iss 1, GKRT0029 Iss 1, GKRT0183 Iss 1, GKRT0300 Iss 1, GKRT0306 Iss 1, GMTT0146 Iss 1, GOOT0003 Iss 1, GOOT0011 Iss 1, STDG025 Iss 1 |
Superseded By | GKRT0192 Iss 1 |
Lead Committee | Control Command and Signalling - CCS |
Supporting Committee | Infrastructure - INS |
Briefing Notes | 04 BN15; 10 BN02 |
Impact Assessments
![]() Registered |
04 IA06 |
Deviations
![]() Registered |
08-086-NC
Requirements for Level Crossings (Tracker No 5417)
07-110-NC
Requirements for Level Crossings (Tracker No 4855)
05-087-DGN
Requirements for level crossings
07-089-DGN
Requirements for Level Crossings
07-096-DGN
Requirements for level crossings (Tracker No 4514)
08-223-DGN
Proximity of signals to level crossings at Carmarthen and Whitland (Tracker 5616)
09-069-DGN
Audible warning for user worked Crossing (UWC)enhancement.
09-111-DGN
Valley Signalbox Telephone Absence Switch.
09-162-TNC
Positioning of Protecting Signals At Crossings Worked by Signallers or Crossing Keepers on the Cambrian.
09-199-DGN
Level crossing protected by Stop boards at Hirst Lane Level Crossing.
09-202-DGN
Protecting signals for level crossings not to be re positioned to meet the modern metric standard.
09-203-DGN
Minimum distance of 25m be set aside at a bay or terminal platform.
09-064-DGN
Position of protecting signal at MCB crossing - Winning
09-262-DGN
Application of Level Crossing Requirements for the Cambrian ERTMS implementation |