Menu

GIRT7012 Iss 1

Requirements for Level Crossings

Synopsis

This document mandates the requirements for the design, construction, inspection, maintenance, operation and decommissioning of level crossings.
Read full standard
register-icon
Registered
Withdrawn
Railway Group Standard
Issued:
01/08/2004
Published:
07/08/2004
In Force:
02/10/2004
Withdrawn:
03/04/2010

Details

Consultation Status Closed
Vehicle Assessment No
Supersedes GCRT5208 Iss 1, GKRT0029 Iss 1, GKRT0183 Iss 1, GKRT0300 Iss 1, GKRT0306 Iss 1, GMTT0146 Iss 1, GOOT0003 Iss 1, GOOT0011 Iss 1, STDG025 Iss 1
Superseded By GKRT0192 Iss 1
Lead Committee Control Command and Signalling - CCS
Supporting Committee Infrastructure - INS
Briefing Notes 04 BN15; 10 BN02
Impact Assessments
register-icon
Registered
04 IA06
Deviations
register-icon
Registered
08-086-NC

Requirements for Level Crossings (Tracker No 5417)

07-110-NC

Requirements for Level Crossings (Tracker No 4855)

05-087-DGN

Requirements for level crossings

07-089-DGN

Requirements for Level Crossings

07-096-DGN

Requirements for level crossings (Tracker No 4514)

08-223-DGN

Proximity of signals to level crossings at Carmarthen and Whitland (Tracker 5616)

09-069-DGN

Audible warning for user worked Crossing (UWC)enhancement.

09-111-DGN

Valley Signalbox Telephone Absence Switch.

09-162-TNC

Positioning of Protecting Signals At Crossings Worked by Signallers or Crossing Keepers on the Cambrian.

09-199-DGN

Level crossing protected by Stop boards at Hirst Lane Level Crossing.

09-202-DGN

Protecting signals for level crossings not to be re positioned to meet the modern metric standard.

09-203-DGN

Minimum distance of 25m be set aside at a bay or terminal platform.

09-064-DGN

Position of protecting signal at MCB crossing - Winning

09-262-DGN

Application of Level Crossing Requirements for the Cambrian ERTMS implementation