Menu

GKRT0044 Iss 1

Controls for Signalling a Train onto an Occupied Line

Synopsis

This document defines the safety critical requirements associated with signalling a second train onto a section of railway line which is already occupied by a train.
Read full standard
register-icon
Registered
Withdrawn
Railway Group Standard
Issued:
01/02/2000
Published:
05/02/2000
In Force:
03/06/2000
Withdrawn:
07/09/2013

Details

Consultation Status Closed
Vehicle Assessment No
Supersedes SSP076 Iss 1
Superseded By GKRT0044 Iss 2
Lead Committee Control Command and Signalling - CCS
Supporting Committee Traffic Operation and Management - TOM
Briefing Notes 00 BN03; 13 BN11
Impact Assessments
register-icon
Registered
00 IA12
Deviations
register-icon
Registered
04-010-NC

Signals controlling movements onto an occupied line involving passenger trains

09-166-DGN

Use of OS mode in place of a position light signal for permissive moves for Cambrian ERTMS Level 2.

09-175-TNC

Conditions before clearing the signal for the second train around Northampton station.

02-306-DGN

Provision of signals controlling movements onto an occupied line

05-144-DGN

Signalling a train onto an occupied line

06-070-DGN

Controls for Signalling a Train onto an occupied line.

07-061-DGN

Controls for Signalling a Train onto an Occupied Line

07-115-DGN

Controls for Signalling a Train onto an occupied line (Tracker No 4776)

08-183-DGN

Bognor signalling works: Installation of signal BR63 at 628 m before the platform ramp

09-056-DGN

Permissive moves from Signal CO1154 at Thorpe-le-Spoken

09-057-DGN

Permissive Working from Signal CO1152 – Thorpe-le-Spoken

09-106-DGN

Permissive Moves within Newbury Interlocking

09-110-DGN

Interlocking associated with permissive moves – Reading Station Area

08-238-DGN

Prohibition of permissive moves from the north into Platform 3 of Colchester Station. (Tracker 5744)

08-186-TNC

Controls for Signalling a Train onto an occupied line (Tracker No. 5605)

02-232-TNC

Provision of signals

04-008-TNC

Provision of signals

04-255-TNC

Distance for Stopping the Second Train for Platform Sharing Purposes

10-093-DGN

Signal controlling a movement of a Second Train into terminal platforms at Scarborough

10-162-TNC

Conditions before clearing the signal for the second train around Northampton Station

View All