GKRT0201 Iss 2
Signalling Design: Production
Synopsis
Sets out the mandatory safety requirements for the production of signalling design. This document will be transferred to Railtrack Line with effect from October 2000.
Read full standard
![register-icon](/-/media/Themes/RSSB/RssbWebsite/Default/images/icons/register-icon.png)
Registered
Withdrawn
Railway Group Standard
- Issued:
- 01/02/1998
- Published:
- 27/02/1998
- In Force:
- 23/06/1998
- Withdrawn:
- 01/10/2000
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Supersedes | GKRT0201 Iss 1 |
Lead Committee | Control Command and Signalling - CCS |
Briefing Notes | 00 BN10 |