RIS-0775-CCS Iss 3
AWS and TPWS Application Requirements
Synopsis
Summary Of Changes
Replaces issue two. Parts 2, 3, 4, and 6 have been revised. Part 5 has received minor changes only. Appendices A, B and C have been revised and Appendices D, E, and F are new. All other Appendices from issue two have been removed.
The following sound files that support this standard can be found on the RSSB website using the following links:
- SPAD alert, contact the signaller
- Overspeed, contact the signaller
NOTE: If you have issues playing the sound file it is recommended to use an alternative internet browser that supports .WAV files.
NOTE: Issue three was republished on 9 March 2021 as the version published on 6 March 2021 was missing section 3.2.8 and had text The implementation of TPWS includes an assumption that derailment risk is tolerable if a train is exceeding the permissible speed by less than 50 %’removed from clause 3.2.10 b).
The content of this document will be reviewed under an existing or future project.
Optional reading and resources:
Watch our webinar for more information
Right Track 41: Ladbroke Grove, SPADs, and the birth of the TPWS
- Issued:
- 06/03/2021
- Published:
- 06/03/2021
- In Force:
- 06/03/2021
- Last Review:
- 17/11/2022
- Next Review:
- 06/03/2027
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Supersedes | RIS-0775-CCS Iss 2 |
Lead Committee | Control Command and Signalling - CCS |
Supporting Committee | Rolling Stock - RST; Plant - PLT; Traffic Operation and Management - TOM |
Briefing Notes | 21 BN07 |
Impact Assessments
Registered |
21 IA04 |
Deviations
Registered |
21-019-DEV
AWS Isolation Indicator Colour |