GERT8000-HB13 Iss 4

Duties of the person in charge of the siding possession (PICOS)

Synopsis

You will need this handbook if you carry out the duties of a PICOS.

Summary Of Changes

An alternative to the requirement to use a sleeper chained to the rails as part of the protection when a possession is taken of only part of a siding was proposed. It was suggested that this method of protection is no longer necessary or suitable in view of the cessation of loose shunting, as well as manual handling issues and difficulties in sourcing a sleeper. The content of GERT8000-HB13 has been reviewed to incorporate changes agreed to be appropriate to protection requirements. These allow use of a derailer as a more easily handled item, with use of a derailer or sleeper required when the portion of the siding is unsafe for the passage of any movement, when work is being undertaken making it unsafe for movements to enter, or when any staff are working on or near that part of the siding.

Sections 4.2 and 9.2 have been revised to add a reference to telling any other person responsible for train movements within the siding, in the interests of completeness.

Obsolete references to Safe Work Leader have been removed throughout.    

 
Read full standard
register-icon
Registered
Live
Rule Book Handbook
Issued:
02/09/2023
Published:
02/09/2023
In Force:
02/12/2023
Next Review:
02/12/2024

Details

Consultation Status Closed
Vehicle Assessment No
Supersedes GERT8000-HB13 Iss 3
Lead Committee Traffic Operation and Management - TOM
Supporting Committee Plant - PLT; Rolling Stock - RST; Control Command and Signalling - CCS
Impact Assessments
register-icon
Registered
23 IA14
Supporting Documents GERT8000-RBBL Iss 39
Deviations
register-icon
Registered
23-040-DEV

Possession Optimisation - enabling clearer safety communications in possessions through web-enabled devices