Inclusion of emergency special working requirements in the Rule Book (IMP-ESW-01)

This report provides an assessment of the risk from emergency special working (ESW) and compares the level of risk with the current methods of responding to extensive signalling failures: Temporary Block Working (TBW), Signal-to-signal (STS) working and stopping train operation through the area until the fault is rectified.
Project Reference: IMP-ESW-01