CECESM Part C.9
Protection of Staff from Trains Passing on Adjacent Lines During Planned Engineering Work Requiring Absolute Possession of the Line
Synopsis
This CESM Part deals with the additional minimum protection arrangements to be agreed with the Operations Department at the planning stage.
Read full standard
Registered
Withdrawn
Other
- Issued:
- 01/03/1993
- Published:
- 01/03/1993
- In Force:
- 01/03/1993
- Withdrawn:
- 31/12/1999
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Lead Committee | Infrastructure - INS |