Menu

CEUSPROC-U03 Iss 2

Testing of Full Rail Section by the BR070 Rail Testing System (R.T.S)

Synopsis

This procedure shall be applied when testing the full rail using the BR070 R.T.S. The purpose of this procedure is to detect the presence of Tache Ovale, horizontal and suspected vertical longitudinal defects.
Read full standard
register-icon
Registered
Withdrawn
Other
Issued:
01/01/1991
Published:
01/01/1991
In Force:
01/01/1991
Withdrawn:
31/12/1999

Details

Consultation Status Closed
Vehicle Assessment No
Lead Committee Infrastructure - INS