COP0008 Iss 2
Code of Practice for Tandem Lifting with Two Excavator Cranes
Synopsis
This Code of Practice details the control measures to be applied when using two excavator cranes to lift a load simultaneously.
Withdrawn
M and EE Networking Group:
Code of Practice
- Issued:
- 01/07/2007
- Published:
- 01/08/2009
- In Force:
- 07/09/2007
- Withdrawn:
- 03/04/2010
Details
Vehicle Assessment | No |
Superseded By | COP0008 Iss 3 |