COP0011 Iss 4
Code of Practice for Planning and Executing Lifting Operations
Synopsis
This Code of Practice details good practice to ensure that all lifting operations are planned and carried out with the correct equipment under a safe system of work. It does not include contract lifts or where knuckle boom cranes are used to deliver or remove materials and equipment to site and where any point of the machine or load will not be "on or near the line".
Summary Of Changes
Upissued to COP0011 Iss 5 following comprehensive revision of the document by M&EE Lifting sub-group
Withdrawn
M and EE Networking Group:
Code of Practice
- Issued:
- 16/09/2015
- Published:
- 05/12/2015
- In Force:
- 05/12/2015
- Withdrawn:
- 01/09/2018
Details
Vehicle Assessment | No |
Supersedes | COP0011 Iss 3 |
Superseded By | COP0011 Iss 5 |