COP0022 Iss 2

Pulling Rail with Road-Rail Excavator Cranes

Synopsis

This Code of Practice provides good practice in the safe pulling of continuous welded rail (CWR) and to minimise the risk of damage to the CWR or infrastructure.

Summary Of Changes

General review, competence aligned with infrastructure manager’s requirements. Removal of table A.2. Addition of guidance when pulling rail around a curve
Withdrawn
M and EE Networking Group: Code of Practice
Issued:
01/07/2019
Published:
07/09/2019
In Force:
07/09/2019
Withdrawn:
04/06/2022

Details

Vehicle Assessment No
Supersedes COP0022 Iss 1
Superseded By COP0022 Iss 3