COP0022 Iss 2
Pulling Rail with Road-Rail Excavator Cranes
Synopsis
This Code of Practice provides good practice in the safe pulling of continuous welded rail (CWR) and to minimise the risk of damage to the CWR or infrastructure.
Summary Of Changes
General review, competence aligned with infrastructure manager’s requirements. Removal of table A.2. Addition of guidance when pulling rail around a curve
Withdrawn
M and EE Networking Group:
Code of Practice
- Issued:
- 01/07/2019
- Published:
- 07/09/2019
- In Force:
- 07/09/2019
- Withdrawn:
- 04/06/2022
Details
Vehicle Assessment | No |
Supersedes | COP0022 Iss 1 |
Superseded By | COP0022 Iss 3 |