COP0022 Iss 3
Pulling Rail with Road-Rail Excavator Cranes
Synopsis
This Code of Practice provides good practice in the safe pulling of continuous welded rail (CWR) and to minimise the risk of damage to the CWR or infrastructure.
Summary Of Changes
Periodic review and put into new M&EE COP format.
Live
M and EE Networking Group:
Code of Practice
- Issued:
- 23/03/2022
- Published:
- 04/06/2022
Details
Vehicle Assessment | No |
Supersedes | COP0022 Iss 2 |