EHQPRO009 Iss 1
Procedure for the Production and Modification of Bonding Plans for Electrified Lines Except Southern Region
Synopsis
This document sets out the procedure which shall be adopted between the D of S&T.E dept. and the D of M&EE or relevant Overhead Line Maintenance dept. when new bonding plans are produced or, because of alterations to the infrastructure, modifications to existing bonding plans are required.
Read full standard
![register-icon](/-/media/Themes/RSSB/RssbWebsite/Default/images/icons/register-icon.png)
Registered
Withdrawn
Other
- Issued:
- 01/08/1990
- Published:
- 01/08/1990
- In Force:
- 01/08/1990
- Withdrawn:
- 31/12/1999
Details
Consultation Status | Closed |
Vehicle Assessment | No |
Lead Committee | Energy - ENE |