Menu

EHQPRO009 Iss 1

Procedure for the Production and Modification of Bonding Plans for Electrified Lines Except Southern Region

Synopsis

This document sets out the procedure which shall be adopted between the D of S&T.E dept. and the D of M&EE or relevant Overhead Line Maintenance dept. when new bonding plans are produced or, because of alterations to the infrastructure, modifications to existing bonding plans are required.
Read full standard
register-icon
Registered
Withdrawn
Other
Issued:
01/08/1990
Published:
01/08/1990
In Force:
01/08/1990
Withdrawn:
31/12/1999

Details

Consultation Status Closed
Vehicle Assessment No
Lead Committee Energy - ENE