Form RT3199 Iss 12-20

Work-site Certificate

Synopsis

This form is used by the Engineering Supervisor to record arrangements for setting up work sites within a possession of a running line.

Summary Of Changes

The December 2020 Rule Book changes allow a work site to be given up with an engineering train or on-track machine standing at the signal or block marker where the possession is to be given up around the train. The rules require the Engineering Supervisor (ES) to tell the Person in Charge of the Possession (PICOP) about the train when giving up the work site and the ES to record this on Form RT3199. The format of Form RT3199 has been amended to allow the ES to do this. 
Read full standard
register-icon
Registered
Live
RB Form
Issued:
05/12/2020
Published:
05/12/2020
In Force:
05/12/2020
Next Review:
05/12/2021

Details

Consultation Status Closed
Vehicle Assessment No
Supersedes Form RT3199 Iss 12-14
Lead Committee Traffic Operation and Management - TOM
Supporting Documents GERT8000-RBBL Iss 34.1
Deviations
register-icon
Registered
22-101-DEV Revised 05-03-2024

The use of signal disconnection as secondary protection for T3 possessions - National Deviation