Menu

GCRT5011 Iss 2

Switches and Crossings

Synopsis

This document sets out general requirements for the design, inspection and maintenance of switches and crossings (S&C). It also defines particular requirements for fixed crossings.
Read full standard
register-icon
Registered
Withdrawn
Railway Group Standard
Issued:
01/12/2000
Published:
03/12/2000
In Force:
03/02/2001
Withdrawn:
04/10/2004

Details

Consultation Status Closed
Vehicle Assessment No
Supersedes GCRT5011 Iss 1
Superseded By GCRT5021 Iss 2
Lead Committee Infrastructure - INS
Supporting Committee Control Command and Signalling - CCS; Traffic Operation and Management - TOM